Laserfiche WebLink
<br />borges + <br />Ci'SWrith E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br /> <br />12. NAME <br />Noel Ogunbunmi, LEED AP, <br />Associate AlA, PP A <br /> <br />13. ROLE IN THIS CONTRACT <br />Job Captain <br />Quality Assurance! Quality <br />Control <br /> <br />a. TOTAL <br />9 <br /> <br />14. YEARS EXPERIENCE <br />b. WITH CURRENT FIRM <br />1 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Bor es + Associates, P.A. Miami, FL <br />16. EDUCATION (DEGREE AND SPECIALlZA TION) <br />University of East London, London UK, Masters of Architecture <br />University of East London, London UK, Bachelors of Architecture <br />Croyton College England, UK, City and Guilds in AUTOCAD, <br />20/30 & AUTO CAD AER R13 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Memberships: RIBA Chartered Architect, Riba London, UK, EESA-NAAB, NAAB, Washington DC <br />Awards: Team player in winning Barnsley Competition Scheme with HMA & CZWG, Received Honor Prize. <br />lEED Accredited Professional <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND <br />DISCIPLINE) <br /> <br /> 19. RELEVANT PROJECTS <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Hialeah Palm Center, Hialeah, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> 2008 N1A <br />a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND [Xl Check if project performed with current firm <br /> Role: Quality ControU Quality Assurance. Affordable Residential Building: 81,840 Gross Sq. Ft. 5 stories, 72 residential units, inside <br /> courtyard and multi purpose room. Out-Patient Medical Facility: 6,200 Gross Sq. Ft. 1 story medical facility, physician offices, exam rooms, x- <br /> ray, vitals, etc. Parking Garage Structure: 118,682 Gross Sq. Ft. 3 elevated decks garage with capacity for 350 cars. On grade parking for 161 <br /> cars. Designed to achieve LEED Silver Certification <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami Free Zone Office Building, Miami, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> Under contract N1A <br />b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND [Xl Check if project performed with current firm <br /> Role: Quality ControU Quality Assurance. The Project Consist of a new eight (8) story Office/RetaiVGarage building between two existing <br /> buildings connected by a bridge with a total of approx. 450,000 S/F including new space planning for U.S Customs, and renovation and <br /> incorporation of the existing bridge turned into commercial space. The design included enabling the site to receive the new building by <br /> relocating utility services, parking spaces, upgrading of existing mechanical equipment, etc. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Port of Miami, Miami, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> 2009 N1A <br />c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND [Xl Check if project performed with current firm <br /> Role: Quality ControU Quality Assurance. The renovation and alteration to the existing fabric of the Port of Miami Terminal C, located in <br /> Biscayne Bay, Florida. The scope of which includes the demolition and removal of elements to create new openings to the existing building for <br /> three new entrance gates to receive the new passenger boarding bridge link to NCL's largest cruise liner. Our design intervention had to be <br /> sensitive to the history of four subsequent additions and alterations over the last 30 years to meet the shipping and growth demands of South <br /> Florida's community. The secondary support for the entrance gate and door was designed to be a standalone system behind the existing <br /> window system. New steel supports and building system for the North gate opening was designed to behave in the same manner as the <br /> existing while complying with new code requirements. Redundant ducts and HV AC systems where retained, painted, capped (to avoid opening <br /> existing roof penetrations) and concealed with a new eQQ crate ceilina svstem, creatina a oleasant and free flowina ooen space below. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Hull Interchange, England, UK PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> 2006 N1A <br />d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND [Xl Check if project performed with current firm <br /> Role: Sr. Designer $24 M. extension and refurbishment to an existing transport interchange building. The new additions consists of a new <br /> Travel center, Front entrance canopy, Bus concourse, glazed north wall, concourse and retail units, present travel center, south entrance <br /> canopy, and bicycle provision were refurbished. <br /> <br />STANDARD FORM 330(6/2004) PAGE 8 <br />