Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> <br />12. NAME <br />Gustava Berenblum <br /> <br />13. ROLE IN THIS CONTRACT <br />Project Director <br /> <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />BEA Architects, Inc. <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Master of Science Advanced Architectural Design Columbia <br />University 1991 <br />Professional Architectural De ree Ar entina 1989 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards. etc.) <br />Completed acclaimed buildings which have won numerous design awards, He participates in symposiums and lectures expensively on BEA's <br />work and on the application of GREEN strategies in architecture, He serves as an advisor to several organizations and is a founding member of <br />Florida International University's School of Architecture Board, As a Partner at BEA, he heads the international and local transportation projects <br />as well as the rowin sectors of Educational Facilities, Trans ortation and Sustainable Architecture, <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND <br />DISCIPLINE) <br />Florida AR 0016278 <br /> <br />LEED Accredited Professional <br /> <br /> <br />(1) TITLE AND LOCATION (City and State) <br />City of Miami Gardens Public Works & Police Dept., Miami Gardens, FL. CONSTRUCTION (If applicable) <br />2007 2007 <br /> <br />a (3) BRIEF DESCRIPTION (Brief sCDpe, size, cost, etc.) AND SPECIFIC ROLE EI Check if project performed with current firm <br />Space Planning, Interior Design & Architectural Services for the conversion of existing warehouse buildings into the new Police & Public Works <br />Departments. (10,000SF) <br /> <br />(1) TITLE AND LOCATION (City and State) <br />Florida Atlantic University Covered BasketballNolleyball Courts, Boca Raton, FL. PROFESSIONAL SERVICES <br />2003 <br /> <br />b (3) BRIEF DESCRIPTION (Brief scope, size, CDst, etc.) AND SPECIFIC ROLE 0 Check if project perfDrmed with current firm <br />Design services for a 15,000 sf project., to be utilized by the University and high school, it includes bleachers, covered courts and storage areas. The <br />design takes advantage of an existing high school adjacent to the University's campus and is actually an extension of the high school's campus. <br /> <br /> <br />(1) TITLE AND LOCATION (City and State) <br />F.I.U. Football Stadium, Miami, FL. <br /> <br /> <br />PROFESSIONAL SERVICES <br />2005 <br />C <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm <br />Principal ArchitecUEngineer for the expansion and renovation to construct an NCAA Division 1A compliant and mukipurpose sports stadium at Florida <br />International University. <br />(1) TITLE AND LOCATION (City and State) <br />F.I.U. Athletic Training Facility, Miami, FL. <br /> <br /> <br />PROFESSIONAL SERVICES <br />2003 <br /> <br />d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm <br />As part of the Stadium project a $12M 35,000 sf Field House for athletes has been built. BEA provided full AlE services, The project that was <br />completed in 2009 includes a weight lifting room, coaches offi ces, athletic rehabilitatiDn center, lockers for the home team and a team meeting room. <br /> <br />(1) TITLE AND LOCATION (City and State) <br />City of Miami Gardens, Miami Gardens, FL PROFESSIONAL SERVICES <br />2007 <br /> <br />e (3) BRIEF DESCRIPTION (Brief SCDpe, size, cost, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm <br />BEA provided masterplanning services for eight parks in the City of Miami Gardens. Designs for individual structures involved new clubhouses and <br />revamped infrastructure, parking lots, athletic fields, tennis courts and landscaping to including gardens. The parks include Andover, Brentwood, <br />Buccaneer, Cloverleaf, North Dade Optimist Park, Lake Lucerne, Vista Verde, and Norwood Park & Pool, Upon completion of the masterplanning <br />hase, BEA en a ed in the desi n develo ment of individual arks, <br /> <br /> <br />RFQ #10-04-02 Professional Architectural Services I 13 <br />