Laserfiche WebLink
<br />- <br /> <br /> 14. YEARS EXPERIENCE <br />12. NAME 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM <br />Sean Compel, PE, LEED AP Construction Administrator 8 8 <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Corzo Castella Carballo Thompson Salman, P.A. (C3TS) - Coral Gables, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALlZA TlON) <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />Bachelor of Science in Civil Engineering <br />University of Miami, Miami, Florida, 2002 <br /> <br />State of Florida Professional Engineer License No. 66618 <br />LEED Accredited Professional <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE ANO LOCATION (City and State) (2) YEAR COMPLETED <br /> Village of Pinecrest Watermain Master Plan and System Design PROFESSIONAL SERVICES PROFESSIONAL SERVICES <br /> Pinecrest, Florida 2008 2010 <br />a. <br /> Construction Manager for the design of over 27 miles of watermain to complete the potable water system of the entire Village. The Master Plan was <br /> prepared that included a computerized model of the entire system and public workshops and meetings were held to inform and educate the residents <br /> of the extensive work and cost involved in the project. C3TS also prepared special taxing districts to better explain the finances of the project. <br /> (1) TITLE ANO LOCATION (City and State) (2) YEAR COMPLETED <br /> South Miami Downtown Improvement Projects - Phases I, II, III, IV, South Miami, PROFESSIONAL SERVICES PROFESSIONAL SERVICES <br /> Florida 2004 2005 <br /> Construction Manager for the improvements within the South Miami Downtown area. The first phase of the improvements consisted of. the design, <br />b. permitting, and construction of streetscape improvements on SW 73 St., SW 58 Ave., and SW 58 Ct. The improvements included approximately <br /> 1100 linear feet of 12" DIP watermain extension and new drainage systems. These updated systems were vital to allow the downtown area to <br /> develop and expand. The second phase of work consisted of the design, permitting, and construction of complete streetscape improvements within <br /> the downtown South Miami area on SW 58 Ave. and on SW 73 St. between SW 58 Ave. and SW 57 Ct. The project extended three blocks and <br /> included new wide pedestrian friendly sidewalks, irrigation, lighting, landscaping, 210 Linear feet of 12" DIP watermain, and new drainage systems. <br /> The third phase of work consisted of the design, permitting, construction of sidewalk, drainage and watermain improvements within South Miami's <br /> downtown area on SW 74 S1. between SW 59 C1. and SW 57 C1. and SW 73 St. between SW 59 Ct. and SW 58 Ct. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Claude Pepper Park Youth Community Center & Gymnasium PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> North Miami, Florida 2009 on-going <br />c. (3) BRIEF DESCRIPTION (Brief Scope. size. cost. etc.) AND SPECIFIC ROLE o Check if proiect perfonned with current Finn <br /> Civil Engineer for this $5.5 million multi-purpose youth center which includes classrooms, youth training center, computer labs, and health center. <br /> Services also included parking lot drainage, water main, pump station, and general site development. Programmed to be the crown jewel of the City <br /> of North Miami's Parks & Recreation Department, this facility will occupy a very highly visible location within the western end of the City. This project <br /> is currently in process of Silver LEED certification. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Palmetto Bay Drainage Improvements PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Palmetto Bay, Florida 2007 2008 <br />d. (3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE o Check if proiect perfonned with current Finn <br /> Project Engineer for this project that involved field surveying, design, permitting, bidding, and construction administration of drainage improvements <br /> at 10 locations throughout the Village. These 10 areas were identified by the Village as having flooding problems. The improvements included new <br /> drainage structures, exfiltration trenches, outfalls, and asphalt overlays. The project was completed on schedule and under budget. <br /> <br />AUTHORIZED FOR LOCAL REPRODUCTION <br /> <br />STANDARD FORM 330 (6/2004) <br />