My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C3TS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-02) Prof. Architectural Svcs.
>
Responses
>
C3TS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 11:39:50 AM
Creation date
11/10/2010 11:39:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural Svcs.
Bid No. (xx-xx-xx)
10-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~- <br /> <br />"""'l <br /> <br /> 20. EXAMPLE PROJECT KEY <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S NUMBER <br /> QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. 9 <br /> Complete one Section F for each project.) <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />Renovations, Maintenance & Repairs to Miami Northwestem Senior High School PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Miami-Dade County Public Schools 2007 on-hold <br />Miami, Florida <br /> <br />a. PROJECT OWNER <br /> <br />Miami-Dade County Public Schools <br /> <br />23. PROJECT OWNER'S INFORMATION <br />b. POINT OF CONTACT NAME <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br /> <br />Mr. Gerald Pollock <br /> <br />(305) 995-4535 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANVE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />The scope of work called for a $10 million renovation of this 360,000 sq. ft. school campus by updating key elements for compliance with life safety & <br />accessibility requirements, and correcting campus-wide deficiencies and ADA noncompliance such as the redesign of existing public/student bathroom <br />facilities for barrier removal. C3TS was called to undertake this "expanded maintenance project" based on our past experience in this particular project type <br />for the Miary)l~Dilde County Public School system (MDCPS) and our wealth of in-house resources in Architectureand Engineering. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />~:;;~ <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />c. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br /> <br />AUTHORIZED FOR LOCAL REPRODUCTION <br /> <br />STANDARD FORM 330 (6/2004) <br />
The URL can be used to link to this page
Your browser does not support the video tag.