Laserfiche WebLink
<br />H. ADDITIONAL INFORMATION <br /> <br />30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. <br /> <br />School Board of Broward County - Open-End Services (Architecture Miscellaneous, Architecture Plan Review, <br />Master Planning & Roofing Design Services) - Ongoing <br /> <br />The Russell Partnership, Inc. has provided design, facility inspection services, construction administration and plan review <br />services for the School Board of Broward County in the areas of Building Code Compliance, ADA compliance, life safety and <br />general renovations and remodeling. The Russell Partnership, Inc. is currently on its 3rd plan review contract with SBBC and <br />has made over 590 plan reviews for Building Code Compliance, 6A-2 Compliance and SBBC Design Standard Compliance <br />under these contracts. Reviews of plans has included a wide variety of project types, including new high schools, ADA <br />renovation projects, new classroom buildings, administration buildings, various type of assembly occupancy buildings, <br />media centers, athletic facilities, food service facilities and site related improvements. <br /> <br />School Board of Broward County - Open-End Services for Architecture Services - Completed 2007 <br /> <br />The Russell Partnership, Inc. provided plan review services for the School Board of Broward County. These reviews included <br />review for Building Code Compliance, 6A-2 Compliance and SBBC Design Standard Compliance. Reviews of plans included <br />a wide variety of project types, including new high schools, ADA renovation projects, new classroom buildings, <br />administration buildings, various type of assembly occupancy buildings, media centers, athletic facilities, food service <br />facilities and site related improvements. <br /> <br />Miami Dade College - College Wide Handrail-Guardrail Code Compliance Study - Completed December, 2009 <br />(Ongoing Contract) <br /> <br />This project involved a survey of handrails and guardrails at all buildings of all eight campuses of Miami-Dade College to <br />determine code and/or life safety deficiencies. All conditions at the campuses which would require handrails and guardrails <br />but for which none were present were also part of this study. This included site conditions where there were changes in <br />elevations, ramps, steps and benches along raised walkways. <br /> <br />Existing handrails/guardrails were evaluated for compliance with both codes at the time of construction as well as current <br />codes. In addition, handrails/guardrails were evaluated for structural deterioration and inadequate structural capacity. <br />Forms documenting materials, dimensions, anchorages, openings, extensions, ADA compliance, etc. were completed and <br />assembled along with photographs of the handrails/guardrails being evaluated. <br /> <br />Design Criteria Professional for Pembroke Pines Middle School Replacement School - Completed 2009 and Pine <br />Ridge Education Center - Completed 2008 <br /> <br />The Consulting Design Criteria Professional (CDCP) is to provide review of the construction documents and evaluate the <br />project construction against the Pine Ridge Education Center Design Criteria Package as well Pembroke Pines Middle <br />Replacement School. <br /> <br />I. AUTHORIZED REPRESENTATIVE <br />The fore oin is a statement of facts. <br /> <br />31. SIGNATURE <br /> <br />Qj).b~ <br /> <br />32. DATE <br />5/24/10 <br /> <br />33. NAME AND TITLE <br /> <br />Macaela Cameron, Marketing Coordinator <br /> <br />AUTHORIZED FOR LOCAL REPRODUCTION <br />MANDATORY USE DATE OF FORM 6/2004 <br /> <br />STANDARD FORM 330 (6/2004) PAGE 6 <br />