<br />12. NAME
<br />Bert Leon, RA, LEED AP
<br />Principal
<br />15. FIRM NAME AND LOCATION (City and State)
<br />RVL Architecture + Design, P.A., Miami, Florida
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Master of Arts in Architecture - 1977 UF
<br />Bachelor of Design in Architecture - 1975 UF
<br />Associate of Arts - 1973 MDC
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13. ROLE IN THIS CONTRACT
<br />Principal in Charge, Design Development a. TOTAL
<br />Constructability Analysis
<br />
<br />33
<br />
<br />14. YEARS EXPERIENCE
<br />b. WITH CURRENT FIRM
<br />15
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />State of Florida, Licensed Architect
<br />State of Florida, Certified General Contractor
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />US Green Building Council, LEED Accredited Professional
<br />US Green Building Council (USGBC) Member
<br />151 International Energy Conference (SEIDE), Santo Domingo, Dominican Republic - Invited Panelist
<br />
<br />19. RELEVANT PROJECTS
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />ADP Total Source, Corporate Headquarters PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Miami, Florida 1997/2007/2008 1998/2008/2009
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />a. 90,000 square feet, two (2) story, corporate headquarters office buil mg. Responsibilities included Program
<br />Development, Schematic & Design Development, and Construction Administration of the Interior Space Planning.
<br />Facility included, centralized secured computer server room, administrative and executive offices, modular open offices
<br />areas for staff, multiple conference and training rooms with enhanced communication technology; cafeteria and lounge
<br />area for 350 em 10 ees; lar e lobbies and uatherinu s aces for ublic functions. Role: Princi al in Char e
<br />(1) TITLE AND LOCATION (Cdy and State) (2) YEAR COMPLETED
<br />Tamiami Chrysler Jeep Dodge Dealership PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Miami, Florida 2008
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />b. 339,600 square feet, 3 story, state of the art, USGBC LEED Gold Certification applicant, multiple function facility
<br />for the Tamiami Automotive Group. Responsibilities included Program Development, Schematic & Design
<br />Development, Construction Administration, and LEED Certification Services for the project. Facility includes
<br />Showroom; Administration offices; Multiple Conference and Staff Training Rooms; Service and Vehicle Diagnostic
<br />Areas; Centralized Ener Mana ement S stem; HV AC Chillers with Ice Storaue S stem. Role: Princi al in Char e
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />City 24 Residential Mixed-Use Development PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Miami, Florida 2006 2008
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />c. 285,000 square feet, 15 stories, Mixed-use Residential and Commercial Project. Responsibilities included Program
<br />Development, Schematic & Design Development and Construction Administration Services. Project includes a multi-
<br />level Parking Garage at the building's pedestal; Ground and second floor commercial retail spaces; 117 residential
<br />units; Building lobbies and multiple amenities areas such as gym, recreational areas, and community rooms. Role:
<br />Princi al in Char e
<br />(1) TITLE AND LOCATION (City and State)
<br />METRO Ford Dealership, Showroom and Administration Facility
<br />Miami, Florida
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />
<br />2006
<br />
<br />2007
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />d. 8,000 square feet, single story, Showroom and Administration facility for Metro Ford. Responsibilities included
<br />Program Development, Schematic & Design Development and Construction Administration Services for the project.
<br />Scope of work included the restoration of the facility after the destruction of the showroom and offices by a major fire.
<br />Project was completed without the suspension of operation of the dealership and within a short time table. Role:
<br />Princi al in Char e
<br />(1) TITLE AND LOCATION (City and State)
<br />Warren Henry Automobiles
<br />Miami Gardens, Florida
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2008
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />e. 370,000 square feet, 3 story, USGBC LEED Silver Certification applicant, multi function facility for Jaguar, Land
<br />Rover, Volvo and Infinity. Responsibilities included Program Development, Schematic & Design Development,
<br />Construction Administration, and LEED Certification Services for the project. Facility includes: MIS Room;
<br />Showrooms; Administration offices; Multiple Conference and Staff Training Rooms; Service and Vehicle Diagnostic
<br />Areas; Centralized Energy Management System; HV AC Chillers with Ice Storage. Role: Principal in Charge
<br />
<br />STANDARD FORM 330 (112004) PAGE 2
<br />
|