Laserfiche WebLink
<br />12, NAME <br />Hjalmar Mok, LEED AP <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13, ROLE IN THIS CONTRACT <br />Project Architect a, TOTAL <br />7 <br /> <br />14, YEARS EXPERIENCE <br />I~ WITH CURRENT FIRM <br /> <br />15, FIRM NAME AND LOCATION (CIty and State) <br />Dorsk Hod son Parrish Yue - Fort Lauderdale, Florida <br />16, EDUCATION (DEGREE AND SPECIALIZATION) <br />Roger Williams University, Bachelor of Science in Architecture <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Hjalmar Mok has seven years of experience in a wide range of projects from schematic design and through construction administration. <br />He is a dedicated individual who always meets challenges of aggressive project schedules. <br /> <br />19. RELEVANT PROJECTS <br /> <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Pompano Beach CRA PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Pompano Beach, Florida Ongoing <br />a. (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc) AND SPECIFIC ROLE [gICheck if project performed with current firm <br />Project Size: multiple projects Cost: N/A Role: Project Architect <br />Master planning, development site studies, architectural fac;:ade renovation, downtown and pier redevelopment planning in the <br />East and Northwest CRA Districts within the City of Pompano Beach. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Overtown Transit Village PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Miami, Florida Phase I - 2007 Phase I - 2007 <br /> Phase II - 2010 Phase II - 2010 <br />b. (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc) AND SPECIFIC ROLE [gIcheck if project performed with current firm <br />Project Size: 665,000 sf Cost: $98m Role: Project Architect <br />A two-phased, urban revival and transit oriented development that includes 665,000 sf of governmental offices for various <br />agencies of Miami-Dade County GSA. The project includes two towers of 17 and 22 stories, a 9-story garage and a 4,000 sf <br />ground floor restaurant. The project is connected to a metrorail station and a bus exchange with a pedestrian plaza. The <br />development is intended to act as a catalyst for other developments and brin~ employment to a bliQht neiQhborhood. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Off Brickell PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Miami, Florida ongoing <br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE [gIcheck if project performed with current firm <br />Project Size: 385,000 sf Cost: $60m Role: Project Architect <br />A mixed-use transit-oriented development that includes 100,000 sf of retail space, 150,000 sf of Class A offices and a 200-key <br />hotel. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Brickell Village PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Miami, FL ongoing <br />d. (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc) AND SPECIFIC ROLE [gIcheck if project performed with current firm <br />Project Size: 100,000 sf Cost: $60m Role: Project Architect <br />An 82,000 sf, 10-story medical office building with a 260-space parking garage on a 0.68-acre urban site. The design challenge <br />for the project includes providing ambulance drop-offs for the hospital anchor tenant that will operate an out-patient facility, parking <br />on a very tiQht site, and liner habitable space required by the City PlanninQ and ZoninQ Department. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Miami Medical Office Building PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Miami-Dade County, Florida ongoing <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE [gIcheck if project performed with current firm <br />Project Size: 160,000 sf Cost: $32m Role: Project Architect <br />An 11-story, 160,000 sf medical office building with 600-space parking garage and an emergency vehicle drop-off area on a 1.0 <br />acre site. The project will be the yth largest Oncology Center in the Nation, and includes an urgent care surgical center with <br />ambulance drop off. <br /> <br />STANDARD FORM 330 (1/2004) PAGE 2 <br />