My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ACAI
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-02) Prof. Architectural Svcs.
>
Responses
>
ACAI
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 1:35:42 PM
Creation date
11/10/2010 1:34:52 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural Svcs.
Bid No. (xx-xx-xx)
10-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />I <br /> <br />DAVID W. DYER FEDERAL BLDG. I COURTHOUSE <br />Miami, Florida <br /> <br />architecture . engineering <br /> <br /> <br />ACAI Associates served under a 5 year <br />(extended to 61/2 years) Open End, Indefinite <br />Delivery/Indefinite Quantity Contract with <br />GSA to provide unlimited Architectural/ <br />Engineering and Construction Management <br />services. The work includes Courthouses <br />and Federal Buildings throughout Southeast <br />Florida region and was expanded to include <br />Ocala and airports (for TSA). <br /> <br />The David Dyer Federal Courthouse Building <br />is of 1926 Vintage and is in the National <br />Register of important Historic Buildings. As <br />part of its long range responsibility, ACAI has <br />been charged with the task of refurbishing. <br />updating and preserving this magnificent <br />structure. one system at a time. The facility <br />has multiple tenancy including the 4th District <br />Court; the US Marshal's Office and GSA. <br />Project Assignments included the following: <br /> <br />1. Prepare Master Plan for facility, pre- <br />serve Historic Building and Courtroom: <br /> <br />2. Design the retrofitting of ballistic glaz- <br />ing panels to the first floor Judges' cham- <br />bers. <br /> <br />3. Rewire existing roll-up gates to emer- <br />gency generator circuit. <br /> <br />4. Window retrofit and life safety improve- <br />ments. <br /> <br />5. Phased total HVAC system retrofit <br />upgrade and consolidation for entire facil- <br />ity. <br /> <br />6. Exterior lighting upgrade. <br /> <br />7. Window Glazing upgrade. <br /> <br /> <br />c.etedIf..4tiH-f) <br /> <br />construction management <br /> <br /> <br />.-~ ~ <br />~ <br />~ <br /> <br />architecture <br /> <br />engineering <br /> <br />roofing consulting <br /> <br />altd 9i~ilt9 d,u.' <br />
The URL can be used to link to this page
Your browser does not support the video tag.