My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mc Harry Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-02) Prof. Architectural Svcs.
>
Responses
>
Mc Harry Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 2:01:12 PM
Creation date
11/10/2010 2:00:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural Svcs.
Bid No. (xx-xx-xx)
10-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />RFQ 10-04-02 Professional Architectural Services <br /> <br />12. NAME <br /> <br />13. ROLE IN THIS CONTRACT <br /> <br />Thomas M. Carlson, AlA, <br />LEED, AP Principal <br /> <br />14. YEARS EXPERIENCE <br /> <br />Design Principal <br /> <br />a. TOTAL b. WITH CURRENT FIRM <br />40 36 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />M.C. Harry & Associates, Inc. / Miami, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALlZA TION) <br />Bachelor of Science in Architecture, 1973 <br />Iowa State University <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br />1977 - Architecture Florida (#7420) / NCARB <br />Certified <br />2004 - LEED Accredited Professional <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training. Awards, etc.) <br />United States Green Building Council (USBGC) <br />"Eco-Structure", Nov. - Dec. 2004 - "Law & Order" About Historical Dade County Courthouse <br /> <br />19. RELEVANT PROJECTS <br /> <br />1) TITLE AND LOCATION (City and State) <br />Architect for Miscellaneous Projects <br />City of South Miami <br /> <br />(2) YEAR COMPLETED 1994 - Ongoing <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Architecture Various Projects <br /> <br />a. <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Design Principal for an on-going contract that includes AlE consultation and conceptual planning, cost estimates, <br />ADA Assessment for various City facilities and various minor building renovations and improvements. <br /> <br />(1) TITLE AND LOCATION (City and State) <br />ADA Transition Plan <br />Broward County <br /> <br /> <br />sis <br /> <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Design Principal for a county wide survey analysis and documentation of accessibility barriers for over 2.5 million <br />square feet of public facilities. These surveys has to be coordinated with over eight different county departments <br />and user agencies such as Department of Public Works, Aviation Department and Libraries Division. <br /> <br />1) TITLE AND LOCATION (City end State) <br />Miscellaneous AlE Services <br />Florida International University <br /> <br />(2) YEAR COMPLETED On-going <br />PROFESSIONAL SERVICES CONSTRUCTION (if <br />Architecture applica.ble) <br />Projects under $1 <br />Million <br /> <br />c. <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE Check if project parformed with current firm <br />Design Principal Projects included renovation of elevators, DM Building Laboratories, Stucco Repairs, <br />Observatory Study, HVAC Improvements to Room 165 and the Wolfson Historic Restoration Study. <br /> <br />1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 1999-2000 <br />Miscellaneous AlE Services <br />City of Miami Beach <br /> <br />PROFESSIONAL SERVICES <br />Arch itectu re <br /> <br />CONSTRUCTION (if applicable) <br />$50 Thousand <br /> <br />d. 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Design Principal - For this contact MC Harry was commissioned with the ADA barrier removal program of various <br />city buildings. The facilities remained operational during the construction of replacement ramps. <br /> <br />1) TITLE AND LOCATION (City and State) <br />AlE Miscellaneous Services <br />Miami Dade County - General Services Administration <br /> <br />(2) YEAR COMPLETED 1980 - Ongoing <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Architecture Various Projects <br /> <br />e <br /> <br />Principal in Charge The project involved over $15 million in construction costs over a twenty year period. <br />Architectural and engineering tasks included various investigation studies (exterior restoration, upgrading the <br />various building utilities such as telephone, air conditioning systems, elevator systems), complete space planning <br />and reprogramming. <br />
The URL can be used to link to this page
Your browser does not support the video tag.