My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mc Harry Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-02) Prof. Architectural Svcs.
>
Responses
>
Mc Harry Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 2:01:12 PM
Creation date
11/10/2010 2:00:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural Svcs.
Bid No. (xx-xx-xx)
10-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />RFQ 10-04-02 Professional Architectural Services <br /> <br />12. NAME <br />Javier Torres, AlA, LEED AP <br /> <br />13. ROLE IN THIS CONTRACT <br /> <br />14. YEARS EXPERIENCE <br /> <br />Project Manager <br /> <br />10 <br /> <br />b. WITH CURRENT FIRM <br />10 <br /> <br />a. TOTAL <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />M.C. Harry & Associates, Inc. / Miami, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Master of Architecture, Florida A& M University, 1998/ Bachelor <br />of Science, Florida A&M University 1994 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Architecture Florida (#94538) <br />LEED Accredited Professional <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />19. RELEVANT PROJECTS <br /> <br />1) TITLE AND LOCATION (City and State) <br />Royal Oaks Park Community Center, <br />Town of Miami Lakes <br /> <br />(2) YEAR COMPLETED 2009 <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Architecture $2.1 Million <br /> <br />B. <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager for Town of Miami Lakes, a silver level LEED registered 9,000sf facility compromised of a main <br />entry lobby / circulation core; a reception / office space; a multipurpose room with operable partitions dividing the <br />s ace into four se arate venues; and a warmin kitchen. <br />(1) TITLE AND LOCATION (City and State) <br />Vizcaya Community Center <br />City of Miramar <br /> <br />(2) YEAR COMPLETED 201 0 <br />PROFESSIONAL SERVICES CONSTRUCTION (if <br />Architecture applicable) <br />$2 Million <br /> <br />b. <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager for the 7,660 GSF single story 'green' Community Center building serves as the anchor and <br />support facility for the 20 acre park development. LEED Silver Certification. <br /> <br />1) TITLE AND LOCATION (City and State) <br />Police Substation and Mounted Police Stable Facility <br />City of Miami <br /> <br />(2) YEAR COMPLETED 2008 <br />PROFESSIONAL SERVICES CONSTRUCTION (if <br />Architecture applicable) <br />$944,000.00 <br /> <br />c. <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project manager for design a new substation and horse stable for their mounted police unit. The 5,500sf, stable <br />building has 11 horse stalls and office space with restrooms and changing areas. <br /> <br />1) TITLE AND LOCATION (City and State) <br />Country Club Park of Miami Clubhouse & Pool Facility <br />Miami Dade County Parks <br /> <br />(2) YEAR COMPLETED 2010 <br />PROFESSIONAL SERVICES CONSTRUCTION (if epplicable) <br />Architecture $3.3 Million <br /> <br />d. <br /> <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Scope elements include lobby/reception space; multipurpose / dining room; outdoor dining patio; warming kitchen <br />for catered events; exercise room, meeting room, media/activity room, public swimming pool and related toilet / <br />shower with locker rooms with a security office. <br /> <br />Dinner Key Marina Dockmaster Facility <br />City of Miami <br /> <br />e <br /> <br />(2) YEAR COMPLETED On-going <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Architecture $2.7 Million <br />Project manager for design and construction of a new building to replace the existing Dock Master's building, <br />located in Dinner Key Marina. It is planned as a three-story building to be erected on structural pilings. The ground <br />floor will accommodate support facilities, with customers' area and administrative spaces on the second and third <br />floors, respectively. The first floor will consist of a limited parking area, laundry and storage facilities, and vertical <br />circulation spaces. <br /> <br />. MCHARRYASSDCIAIES <br />
The URL can be used to link to this page
Your browser does not support the video tag.