|
<br />12. NAME
<br />Victor M. Avedano, PE, LEED™ AP, QCxP
<br />Principal/ Mechanical Engineer / Director of
<br />Engineering
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13. ROLE IN THIS CONTRACT
<br />Principal-In-Charge I Mechanical Engineer
<br />
<br />14. YEARS EXPERIENCE
<br />a. TOTAL b. WITH CURRENT FIRM
<br />38 14
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Johnson, Avedano, Lopez, Rodriguez & Walewski Engineering Group, Inc.
<br />2510 NW 97TH Avenue, Suite 220
<br />Miami, FL 33172
<br />
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />National University of Cordoba, Republic of Argentina
<br />Bachelors of Science" Mechanical and Electrical Engineering -
<br />1971
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, e/c.)
<br />Member: National Fire Protection Association
<br />Member: American Society of Heating and Refrigeration Engineers
<br />U.S. Green Building Council LEED™ Accredited Professional
<br />Victor has a wide range of experience in the design of HVAC, Plumbing and Fire Protection Systems. ExtensiJe Project Management
<br />experience including project scheduling and budgeting. He is in charge of all Engineering activities in our offICe. In addition to other
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
<br />Professional Mechanical Engineer - Florida - #42459
<br />
<br />types of projects, his government project experience includes water treatment plants, office buildings, auditort ms, transportation
<br />facilities and more.
<br /> 19. RELEVANT PROJECTS
<br /> (1) TITLE AND LOCATION (City and Slate) (2) YEAR COl1PLETED
<br /> Robert King High Park PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
<br /> Miami, Florida 2006 2011
<br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed witt ,urrent firm
<br /> Our office provided the HVAC, Plumbing and Electrical Design for this $1,200,000 project consisting of a n.M 6,500 square foot
<br /> community center, lighted tennis courts, playing area for toddler, basketball courts and illuminated soccer fields.
<br /> Victor was the Mechanical Engineer of Record for this project.
<br /> (1) TITLE AND LOCATION (City and Slate) (2) YEAR COI.1PLETED
<br /> Miramar Regional Park PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
<br /> Miramar, Florida 2005 2007
<br /> I
<br />b. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed witt current firm
<br /> Our office provided the HV AC, Plumbing and Electrical Design for the buildings in Phase II of this new 172 acre park. Phase II
<br /> contains 2 baseball/softball fields and the Aquatic Complex with an interactive water playground and beaci, area. The water
<br /> playground resembles Castaway Island currently located at TV Park and the pool also offers swimming larHS and a dive well.
<br /> These athletic fields will be able to host regional baseball/softball tournaments along with adult and youth leagues.
<br /> Victor was the Mechanical Enaineer of Record for this proiect.
<br /> (1) TITLE AND LOCATION (City and Slate) (2) YEAR COV,?LETED
<br /> Vista Center - Municipal Office Complex PROFESSIONAL SERVICES CONSTRUCTION (It Applicable)
<br /> Palm Beach County, Florida 2004 I 2006
<br />C. (3) BRIEF DESCRIPTION (Briefscope, size. cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed wnh ,current firm
<br /> Our office provided the HVAC, Plumbing, Fire Protection and Electrical Design for this $30,000,000.00, 251,000 sq. ft., Multi-Level
<br /> Office Building, with a 900-Car Parking Structure for Palm Beach County located on Vista Parkway.
<br /> Victor was the Mechanical Engineer of Record on the above-referenced project.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR Cmlr>LETED
<br /> Broward Medical Examiners Facility PROFESSIONAL SERVICES CONSTRUCTION (It Applicable)
<br /> Broward County, FL 2000 2010
<br />d. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
<br /> Our office provided the Mechanical and Electrical Engineering Design for Renovation of an Existing 16,000 Sq. Ft. Medical
<br /> Examiners Facility, including Toxicology Labs, Instrumentation Labs, Robotics, Refrigeration, Distilled Water System, Vacuum
<br /> Pumps, Compressors and Lab Case Work facilities. Our design included the addition of New Emergency Generator System and
<br /> U.P.S. System, and a complete replacement of the Mechanical. Construction Costs: $1,500,000.00
<br /> Victor was the Mechanical Enaineer of Record on the above-referenced proiect.
<br />
<br />STANDARD F )RM 330(6/2004) PAGE 2
<br />".
<br />
|