Laserfiche WebLink
<br />12, NAME <br />William A. Abarca, PE, LEED™ AP <br />Principal/ Electrical Engineer <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br />Electrical Engineer <br /> <br />14, YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENTFIRM <br />24 6 <br /> <br />15. FIRM NAME AND LOCATION (CityandState) <br />Johnson, Avedano, Lopez, Rodriguez & Walewski Engineering Group, Inc. <br />2510 NW 97TH Avenue, Suite 220 <br />Miami, FL 33172 <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />University of Lowell (Massachusetts) <br />Bachelor of Science in Electrical Engineering <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />Professional Electrical Engineer - Florida - P.E. #59238 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training. Awards, etc.) <br />Member: National Society of Professional Engineers <br />U.S. Green Building Council LEED™ Accredited Professional <br />Mr. Abarca has a great deal of experienced in the Design of Electrical Systems for Schools, Industrial, Commercial and Residential <br />Projects. His designs include Power and Communication Systems, Roadway Lighting, Telecommunications, Ball Field Lighting and <br />Amphitheaters, provided with the latest in Dimming & Lighting Systems; Interior and Exterior Lighting; Motors and Controllers; TV., <br />Telephone, Fire Alarm and Security Systems; Emergency Power and Uninterrupted Power Sources; Prime Power Generation, <br />Medium & Low Voltage Distribution Systems, Project Inspection Services. He also has extensive Project Management experience <br />and organizational skills. Mr. Abarca was also a Certified Electrical Contractor. <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and Slate) 12\ YEAR COMPLETED <br /> Young Circle ArtsPark PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Hollywood, Florida 2005 2007 <br />a. (3) BRIEF DESCRIPTION (Brief scope, size. cost, elc.) AND SPECIFIC ROLE [Xl Check if project performed wtth current firm <br /> Our provided HVAC, Plumbing, Fire Protection and Electrical Engineering Design for the nearly twelve-acre Young Circle <br /> ArtsPark project in the heart of downtown Hollywood, Florida which is a venue for art, education, recreation and entertainment <br /> with a total construction cost of $21 million. The cultural facilities will include an amphitheater with covered seating for several <br /> hundred patrons, as well as abundant festival lawn seating. The amphitheater will have state-of-the-art sound, light, and <br /> projection systems for programs that will include concerts, plays, dance performances, and films. A smaller studio, or "black <br /> box' theater, will be available for meetings, performances, banquets, and receptions. A new gallery space is also included for <br /> exhibiting the latest trends in the visual arts. William was the Electrical Engineer of Record for this project. <br /> (1) TITLE AND LOCATION (City and Slale) (2) YEAR COMPLETED <br /> Robert King High Park PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Miami, Florida 2006 2011 <br />b. (3) BRIEF DESCRIPTION (Briefscope, size. cost, elc.) AND SPECIFIC ROLE [Xl Check if project performed wtth current firm <br /> Our office provided the HVAC, Plumbing and Electrical Design for this $1,200,000 project consisting of a new 6,500 square foot <br /> community center, lighted tennis courts, playing area for toddler, basketball courts and illuminated soccer fields. <br /> William was the Electrical Engineer of Record for this project. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miramar Regional Park PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Miramar, Florida 2005 2007 <br />C. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Our office provided the HV AC, Plumbing and Electrical Design for the buildings in Phase II of this new 173-acre park. Phase II <br /> contains 2 baseball/softball fields and the Aquatic Complex with an interactive water playground and beach area. The water <br /> playground resembles Castaway Island currently located at TY Park and the pool also offers swimming lan'es and a dive well. <br /> These athletic fields will be able to host regional baseball/softball tournaments along with adult and youth leagues. <br /> William was the Electrical Enaineer of Record for this oroiect. <br /> (1) TITLE AND LOCATION (City and Slale) (2) YEAR COMPLETEO <br /> Gulf Middle School Renovation PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Lee County, Florida 2008 2009 <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, elc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> <br />STANDARD FORM 330 (6/2004) PAGE 4 <br />