Laserfiche WebLink
<br />l <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each Droiect.) <br />21. TITLE AND LOCATION (City and State) <br />City of Miami <br />AlE Project Consultant Continuing Contract (2004-2006) <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />5 <br /> <br />Miami. FL <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If epplicable) <br />2004-2006 Various <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER b. POINT OF CONTACT NAME <br />City of Miami Marcel Douge <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Provide Basic AlE Services at Various Broward School Locations. The projects include but are not limited to: <br /> <br />Williams Park Juan Pablo Duarte Park l- <br />This project involved the renovation and This project involved the renovation and r. " <br />expansion of the Recreation and Pool expansion of an existing recreational facility. <br />Facilities providing a newly renovated The expansion of the facility includes a new <br />kitchen, restrooms, and hardscape plaza. The multi-purpose room, air-conditioning all <br />new addition is to include a new classroom, throughout the entire structure, new park <br />arts and crafts room, and a computer room. management offices, and impact resistant <br />The existing pool building will be repainted windows. <br />and retrofit with new amenities including Cost: $268,200 <br />ticketing office and public lockers. Year: 2004 <br />Cost: $81 7,000 <br />Year: 2004 <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br /> <br />305-416-1245 <br /> <br /> <br />'/ ~~.: <br />- " <br /> <br /> <br /> <br />~......:;.:. <br /> <br />~ ...... <br /> <br />. . <br />.'J~.~~'" <br /> <br />-- --~- <br /> <br />- <br /> <br />Morninaside Park <br />This project involved the renovation and <br />expansion of an existing recreational facility. <br />The expansion of the facility includes a new <br />arts and craft room, air-conditioning all <br />throughout the entire structure, new park <br />management offices, and impact resistant <br />windows. In addition, the building is to have its <br />restroom fixtures, flooring, lighting, and doors <br />replaced. An all new parking lot area will <br />provide additional parking spaces. <br />Cost: $582,200 <br />Year: 2005 <br /> <br /> <br />~ <br /> <br /> <br />~a.. <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />8. Architeknlcs, Inc. Miami, FL Architect of Record <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (31 ROLE <br />b. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />C. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br /> <br />ST ANDARD FORM 330 (6/2004) PAGE 3 <br />