Laserfiche WebLink
<br />CITY OF SUNNY ISLES BEACH I PROFESSIONAL ARCHITECTURAL SERVICES <br /> <br />KNOWLEDGE AND EXPERIENCE WITH CODES <br />The Architeknics, Inc. team is comprised of registered entities and individuals capable of working in the State of <br />Florida that have been working within the South Florida Community for over 30 years; therefore, they are all <br />experienced and well-versed in all local, state, and federal codes especially as it relates to Educational and <br />Governmental Facilities. In addition, Lourdes Rodriguez, AlA. Ramon G. Perez-Alonso, R.A. and Edward C. <br />Berounsky, R.A. are all UBCllnspector trained (SREF). <br /> <br />SAFETY ASSESSMENT CERTIFICATION <br />Lourdes Rodriguez, AlA and Edward C. Berounsky, R.A. were recently certified by the State of California as <br />Safety Assessment Responders. The Safety Assessment Program utilizes volunteers and mutual aid resources to <br />provide professional engineers, architects, and certified building inspectors to assist local and state <br />governments in safely evaluating their built environment. specific lifeline systems, and facilities in the aftermath <br />of any disaster for immediate occupancy and/or continued use. This program is managed by the State of <br />California with the cooperation of several professional organizations. It is also acknowledged by the Federal <br />Emergency Management Agency (FEMA) which allows Safety Assessments effective immediately after the <br />Government determines the area is clear for assessment. <br /> <br />In turn, this allows our team to be among the first wave in providing field evaluations of buildings and other <br />infrastructure for safety. With two of our Principals available as Safety Assessment Responders in case of an <br />emergency, our firm is able to expand and contribute more time to evaluating City buildings while our third <br />Principal oversees the production of all other required services. The knowledge gathered under this <br />certification process includes the most currently updated curriculum prepared by the Governor's Office of <br />Emergency Services (OES), practical examples of post-disaster field conditions impacting structural safety, <br />assessing the degree of severity, posting, and barricading procedures. Our goal is to work directly with <br />Emergency Response Services to offer the City of Sunny Isles Beach accurate facility safety assessments as <br />quickly as possible to determine if there are safety hazards to building occupants, the general public, or the <br />existing learning environments. If any building is determined unsafe, our team's timely analysis and quick <br />response effort can expedite the ensuing necessary services by providing the City with Accounting / Estimating <br />Services, Design Services, Drafting Services, Preparing Scopes of Work to Repair Damaged Areas, Filling FEMA <br />Forms, Clerical Duties, Preparing Reports, and any other related services. <br /> <br />COST CONTROL PERFORMANCES <br />Architeknics, Inc. also recognizes the importance of cost control within an emergency response effort. The <br />need to maintain a careful balance between the project scope and budget must be recognized from the <br />outset of the project. We pride ourselves in our record of maintaining projects within pre-established budget <br />and time constraints. We have compiled this record through a systematic approach and the application of <br />constant management attention. Through our cost control procedures, Architeknics, Inc. has been able to <br />maintain projects within budget throughout the design and bidding process. A significant aspect of our <br />contribution to any project is our participation in the preparation of a detailed total project cost model and <br />project cost estimate. As the desired program is confirmed by the Client, we begin preparation of a cost <br />model that identifies all of the categories of construction that will have an impact on the project. Costs are <br />then associated with each element of the cost model as the program is further developed. With this cost <br />modeling approach, Architeknics, Inc. develops cost information during the programming process rather than <br />waiting until the design is underway. This insures a "management of expectations" throughout the project that <br />fits within the established financial parameters. <br /> <br />In addition to trying to maximize the overall value of construction, Architeknics, Inc. takes into consideration the <br />how, when and where versus only thinking about programmed spaces, it is often possible to provide a variety <br />of activities in one space. This approach proves efficient when it reduces the overall square footage that <br />would be required while controlling the cost of the overall project by getting rid of the unnecessary costs of <br />redundant spaces. This efficient elimination process results in expanding the available resources for high-quality <br />finishes and furnishings or to provide for some other activity or construction method that could fall under the <br />realm of acceptable LEED Certification points for any size project.