Laserfiche WebLink
<br />LiST OF PROJECT WITHIN THE LAST FIVE YEARS <br /> <br />Project: Palms Coul/try Club in Pembroke Pines <br />Client: Grand Palms Contact Name: Mr. Pat Segall <br />Date: Completed 11/2008 <br />Scope of Service Provided: Design of additional right and Left hand turns of the Grand Palms Drive <br />Design of additional right and Left hand tUIllS of the Grand Palms Drive into Pines Blvd., As well as widening of <br />Pines Blvd. in order to accommodate the acceleration/deceleration lane of the Grand Palms Drive to the Pines Blvd. <br />East bound. This project is consist of adding lane widening to the existing State road, lighting. median work. <br />landscaping, curb and gutter. additional singes pavement marking. and modification of the existing signalization. <br /> <br />City: <br />Phone: <br /> <br />Pembroke Pines <br />954-431-8800 <br /> <br />I)roject: <br />Client: <br /> <br />lIopeH'e/l flaptist Church l)aycare, <br />Hopewell Baptist Church Contact Name: <br /> <br />Reverend Robert <br />Stanley <br /> <br />City: <br />Phone: <br /> <br />Pompano Beach <br />954-675-5449 <br /> <br />Date: Completed 06/2008 <br />Scope of Service Provided: Design and Special Inspector <br />15,000 SF Daycare Facility by conventional spread footing with isolated column pads. Reinforce concrete slab on <br />grade. Structural frame consist of reinforced concrete masonry bearing wall with Structural steel tube columns. Wood <br />roof structure consists of open web joists, girders and plywood sheeting. <br /> <br />Pn~iect: Insurance Auto Actiol/ <br />Client: Bergeron Land Development <br />Date: Completed 06/2007 <br />Scope of Service Provided: Structural design, code compliance inspection and observation and materials testing <br />Representative to the owner during construction. Representative for all associated paperwork thm the completion and <br />certification of the project. <br /> <br />Contact Name: <br /> <br />Lonnie Bergeron <br /> <br />City: <br />Phone: <br /> <br />Pembroke Pil/es <br />954 680-0223 <br /> <br />Project: <br />Client: <br /> <br />Tabemade Missionary Baptist Church <br />Tabernacle Baptist Church Contact Name: <br /> <br />Deacon Harvey <br />La Count <br /> <br />City: <br />Phone: <br /> <br />Ta /lalUlssee <br />850-599-3405 <br /> <br />Date: Completed 09/2006 <br />Scope of Service Provided: Design and Threshold Inspection <br />25,000 SF Church and Classrooms, and Administration Building. llle foundation consists of auger-cast piles with pile <br />caps and grade beams. A reinforced concrete structural Slab on grade was used. Structural frame consist of reinforced <br />concrete masonry bearing wall. Structural steel tube columns with open web bar joist with girders and metal roof <br />deck. <br /> <br />Project: <br />Client: <br /> <br />lIopeH'e/llJaptist Church <br />Hopewell Baptist Church <br /> <br />Contact Name: <br /> <br />Reverend Robert <br />Stanley <br /> <br />City: <br />Phone: <br /> <br />Pompano Beach <br />954-675-5449 <br /> <br />Date: Completed 06/2005 <br />Scope of Service Provided: lllreshold Inspection <br />25.000 SF Church and facilities support by conventional spread footing with isolated column pads. Reinforce <br />concrete slab on grade. Structural frame consist of reinforced concrete masonry bearing wall. Structural steel tube <br />columns with open web bar joist with girders and metal roof deck. One piece metal roof system was completely built <br />on ground and entire system flown into place on one day. <br /> <br />Pagc 3 or 4 <br />