Laserfiche WebLink
<br />Attachment "B" <br /> <br />Tally Engineering, Inc. <br />LiST OF PROJECT WITHIN THE LAST FIVE YEARS <br /> <br />Project: Christial1 L~fe Church City: SUI/rise <br />Client: Olristian Life Contact Name: Phone: <br />Date: On-going <br />Scope of Service Provided: Architectural, Civil. Electrical Mechanical. Pluming and Geotechnical Services. <br />Construction management, threshold and materials testing services. <br />21,000 squrere feet with munlti purpose room and administration office. <br /> <br />Project: Abreu Nesidel1ce <br />Client: Mr. Abreu <br />Date: On-going <br />Scope of Service Provided: <br /> <br />Contact Name: <br /> <br />City: Golden Heaeh <br />Phone: <br /> <br />Civil Engineering, Electrical, Mechanical. Structural <br />management. threshold and materials testing services. <br />10,400 square feet of a single family home. <br /> <br />Design Services. Construction <br /> <br />ProjeCI: lIeritage Park Parking Garage <br />Client: City of Sunny Isles Contact Name: Jorge Vera <br />Date: On-going estimated completion 08/20 I 0 <br />Scope of Service Provided: Structural inspections, Geotechnical, Materials testing and laboratory services <br />Five-Story Pmking Garage. Scope of inspection was geotechnical, inspection. foundation. structural steel columns and <br />beams, precast members. post tension slabs. masonry inspection. shear wall inspection. wateq)roofing, roof inspection and <br />all sanlpling and testing of earthwork, concrete. and laboratory services. <br /> <br />City: <br />Phone: <br /> <br />SUllny Isles <br />305-792-1912 <br /> <br />Project: The Fountains 01/ Oceal/ /)oulemrd <br />Client: Dinerstein Companies Contact Name: Jody Prochaska <br />Date: Completed 011/2009 <br />Scope of Service Provided: Threshold Inspection and materials testing and construction management <br />Two- Seven Story with two level of Parking Garage in each tower. The foundation consists of auger-cast piles with pile <br />caps and grade beams. With a reinforced concrete structural Slab on grade. And eight inches reinforced posl-lension <br />slab was used on the entire elevated slab. Structural frame consist of reinforced concrete columns and exterior <br />reinforced concrete masonry wall. Performed window buck inspection and final window inspection. Roof inspection, <br />light weight pull test and membrane placement. <br /> <br />City: <br />Phone: <br /> <br />Ft. Lauderdale <br />832-209- 1200 <br /> <br />Project: The Harbor Square <br />Client: Dinerstein Companies <br />Date: Completed 10/2009 <br />Scope of Service Provided: Threshold Inspection and materials testing <br />Two Four Story Tower totaling 740,000 SF and Two stand alone parking gru'age totaling 200.000 SF (one Three-story <br />pru'king gru'age ruld the second Four-story pru'king gm'age) Pru'king Gru'age TIle two tower foundation is support by <br />conventional spread footing with isolated column pads. with a reinforced post-tension slab on grade. Structural frame <br />consist wood system studs. joist and girder and exterior plywood sheeting. Two four story parking garage foundation <br />were improve by vibro-Ootation then conventional spread footing with isolated column pads. A pre-stress joist and <br />girder system with eight inches reinforced slab was used on the entire elevated slab. <br /> <br />Contact Name: <br /> <br />Jody Prochaska <br /> <br />City: <br />Phone: <br /> <br />Or/aI/do <br />832-209-1200 <br /> <br />Pn~iect: Turtle Nun <br />Client: Vero Beach <br />Date: Completed 08/2009 <br />Scope of Service Provided: Design of site for single family home development <br />Design and approve a new site plan to include the following activities for the one hundred and eighty six single <br />family home community: wet and dry retention ponds, environmental plan. mitigation plans. water. sewer, force- <br /> <br />Contact Name: <br /> <br />Sandy Segall <br /> <br />City: <br />Phone: <br /> <br />Vero Beach <br />954-447-7775 <br />