Laserfiche WebLink
<br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Frantz Tassy, P.E. Project Manager o. TOTAL I b. WITH CUR9RENT FIRM <br /> 12 <br />15. FIRM NAME AND LOCATION (City and State) <br />Bermello Ajamil & Partners, Inc., Miami, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Bachelor of Science in Civil Engineering, University of Miami, 1994 Professional Engineer, State of Florida, PE No. 61856 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training, Awards, etc.) <br /> 19. RELEVANT PROJECTS <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Pompano Beach Redevelopment Plan & East Atlantic Blvd. PROFESSIONAL SERVICES I CONSTRUCTION IiI applicable) <br /> Pompano Beach, Florida In Process <br />a. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE [K] Check if project performed with current firm <br /> Project Engineer - in charge of all engineering aspects of the project. The plan included improvements to curb and guffer and <br /> drainage system. Coordinated wifh FOOT to address permiffing issues. Other improvemenfs included a redesigned parking lot, <br /> enhanced pedestrian access to businesses via widened sidewalks, modifications to the existing parking lof drainage system to <br /> accommodate the revised layout and resurfacing and restriping the parking lof pavement accordingly. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Bahia Honda, SR-5 (US-1) Milling and Resurfacing (FOOT - District 6) PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Monroe County, Florida 2005 2007 <br />b. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Project Manager/Engineer. Produced confract plan set which consisted of roadway, signing and pavement marking plans, <br /> typical section sheets, designing upgrades to substandard features, developed water treafment feature, preparing cross section <br /> sheets, assisted in developing the Stormwater Pollufion Prevention Plans, designing traffic control plans for project corridor. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Traffic Calming Improvements PROFESSIONAL SERVICES I CONSTRUCTION (if opplicoblej <br /> Dora!, Florida In Process <br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Project Manager for the design and consfruction of traffic circles and splitter islands as a method of slowing down traffic in <br /> residential areas. Responsibilities for this design-build project include scheduling and conducting bi-weekly meetings between <br /> the City, contractor, and designing engineer, preparing agendas and meefing minutes, and malnfaining RFls, Shop Drawings, <br /> and Miscellaneous Requesf logs. Coordinafion with the Senior Roadway Inspector is initiafed regularly and certification of pay <br /> requests is performed on a monthly basis. The schedule is monitored to ensure construction progresses and remains on track. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> College Road Enhancements PROFESSIONAL SERVICES I CONSTRUCTION (il opplicoblej <br /> Key West, Florida In Process 10/2010 (est) <br />d. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE [K] Check if project performed with current firm <br /> Project Manager for the infrastructure improvemenfs to 0.6 miles. Enhancements include construction of sidewalks, storm <br /> water sysfem modifications, and improvements to bus sfops. Tasks include the preparafion of full-scale engineering drawings, <br /> preparation of permit and contract specifications, and participation in community meetings. Construction administration will <br /> consist of providing assistance fo CEI during construction, revise plans as required, address RFls, review shop drawings, offend <br /> construction meetings, and perform other miscellaneous tasks to assist the City with the successful complefion of the project. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> NW 119th Street Milling and Resurfacing, FOOT - District 6 PROFESSIONAL SERVICES I CONSTRUCTION (If opplicoblej <br /> Miami, Florida 2002 2003 <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE 0Check if project performed with current firm <br /> Project Engineer. Produced roadway plans which included assisting in the development of the roadway plans, signalization plans, <br /> and signing and pavemenf marking plans, designing of plateau intersections of cross streets, and generating computafion book. <br /> <br />STANDARD FORM 330 (6/2004) <br />