Laserfiche WebLink
<br /> G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS <br />26. NAMES OF KEY PERSONNEL 27. ROLE IN THIS CONTRACT 28. EXAMPLE PROJECTS LISTED IN SECTION F <br />(From Section E, Block 12) (From Section E. Block 13) (Fill in "Example Projects Key" section below before completing table. Place <br /> "X" under project key number for participation in some or similar role.) <br /> 1 2 3 4 5 6 7 8 9 10 <br />Frantz Tassy, P.E. Project Manager x x x x x x <br />Jack Young, P.E. Civil Engineer x x x <br />Jose Handal Civil Engineering Designer x x <br />Frank Tejidor, P.E. Engineer x x x x <br />Tony Hernandez, P.E. Construction Admin./lnspections x x <br />Jose Morales, P.E. Construction Inspector x <br />Tere Garcia Public Involvement x <br />Randy Hollingworth Landscape Designer x x x <br />Chris Cawley, RLA Landscape Architect x <br /> 29. EXAMPLE PROJECTS KEY <br />1 College Road Enhancements 6 Public Boat Ramp Engineering for the Florida Keys <br />2 Redevelopment Plan & East Atlantic Blvd. Streetscape 7 West Drive Community Park <br />3 City of Doral Traffic Calming 8 Miami Circle Seawall Replacement <br />4 MDX General Consultants 9 Indian Creek Drive Improvements <br />5 SR 922jN.W. 125 St. from East of N.W. 7th Ave. - West of N.E. 10 South Creek Neighborhood Landscape Improvements <br /> 9th Ave. <br /> <br />STANDARD FORM 330 (6/2004) <br />