Laserfiche WebLink
<br />~"'~""'~ <br /> <br />I(~ <br /> <br />"";-"'-'-"': " <br /> <br />Organizational Chart & Key Personnel Qualifications <br /> <br />Project Manager <br /> <br /> <br />Frantz Tassy, P .E. has over 15 years experience in the field of engineering <br />with an expertise in roadway design. Mr. Tassy has proven his abilities in <br />preparation of Roadway Plan sets, including signing and pavement markings, <br />signalization, and landscaping. He has coordinated with utility companies <br />during the design phase of projects, assisting with the relocation of utilities <br />impacted by construction. He has successfully completed projects utilizing <br />the FOOT Electronic Delivery process and is adept at preparing project <br />Specifications Packages. He is also certified in Advanced Work Zone Traffic <br />Control. Relevant project experience includes: <br /> <br />Traffic Calming Improvements, Doral, Florida <br />College Road Enhancements, Key West, Florida <br />East Atlantic Boulevard Streetscape Improvements, Pompano Beach, Florida <br />SR-5 (US-I) Milling and Resurfacing, FOOT District 6, Monroe County, Florida <br />NE 125th Street Milling and Resurfacing Segments 1 & 2, FOOT District 6, Miami. Florida <br />SW 87th Avenue Milling and Resurfacing, FOOT District 6, Miami. Florida <br />NW 119th Street Milling and Resurfacing. FOOT District 6, Miami. Florida <br />NW 97th Avenue Milling and Resurfacing, Miami-Dade County Public Works, Miami. Florida <br /> <br />Key Personnel <br />Jack Young, P.E. has 39 years of experience in civil engineering. He has created master plans for water, <br />sewer and storm drainage as well as supervised design of collection systems, pump station networks and <br />sewer disposal systems including percolation ponds, injection wells and reuse of golf courses. As projects <br />proceeded through construction, he made periOdic site visits, resolved field construction problems, and <br />coordinated multiple contractors. Relevant project experience includes: <br />West Drive Park, North Bay Village, Florida <br />College Road Enhancements, Key West. Florida <br />Miami-Dade Fire Rescue Dept. (MDFRD) Fire Station Design/Build Contracts, Homestead, Florida <br />FEMA-DERM Drainage & Roadway Improvement Program. FEMA & Miami-Dade County, Florida <br /> <br />Tony Hernandez, P.E. is an accomplished Senior Project Engineer, responsible for overseeing B&A's <br />Construction Services division. He has been responsible for some of the firm's largest and most complex <br />undertakings. Relevant project experience includes: <br />MIA Mover Construction Services, Miami. Florida <br />MIC/MIA Package 2 Collector Distributor Project Grouping, FOOT District VI, Miami. Florida <br />Okeechobee Road Widening & Lejeune Road Flyover, FDOT District VI. Miami, Florida <br />Miami-Dade Expressway Authority (MDX), Miami. Florida <br /> <br />Randy Hollingworth has over 35 years experience as an urban and landscape designer. His specialty is <br />the design and development of public open spaces. Mr. Hollingworth is the Director of B&A's Landscape <br />Studio Department. Relevant project experience includes: <br />Beach Plaza Redevelopment & Public Beach Revitalization Design, Pompano Beach, Florida <br />South Creek Neighborhood Landscape Improvements Plan, Coconut Creek, Florida <br />NW 1 07th Avenue Streetscape, Doral. Florida <br /> <br />Tere Garcia has over 25 years experience in the fields of planning, public participation, governmental <br />and media relations. Ms. Garcia oversees all public outreach activities for planning and design projects <br />for MDX. Currently she is Principal-in-Charge of FDOT District VI. Districtwide Public Involvement Contract <br />which includes public involvement services of approximately 40 planning or design projects. <br /> <br />ba <br /> <br />Professional Engineering Services, No. 10-14-01 I City of Sunny Isles Beach <br /> <br />8 <br />