My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
J. Milton & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 10-10-01 Aquarium and Parking
>
J. Milton & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2010 2:28:27 PM
Creation date
11/16/2010 2:27:54 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Aquatic Entertainment Center
Bid No. (xx-xx-xx)
10-10-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />. <br /> <br />The following proposal is for the Consulting Services: <br /> <br />Venue / Attraction Report: <br />1. We will provide a "shopping lists" of venues, attractions, experiences, and possible animal <br />environments that can be considered for implementation in the project. <br />2. Each item on the list will include the following: <br />a) Brief description of venue with photo. <br />b) Description of the equipment required to operate the venue (provide photo if available). <br />c) Estimated initial investment cost to implement venue or attraction (including installation and <br />equipment costs). <br />d) Estimated monthly costs to operate. <br />e) Estimated income revenues (per ticket sale). <br /> <br />Master Plannin2: <br />1. We will review and provide comments on the existing Schematic Design drawings in relation to <br />the list of venues and attraction recommendations. <br />2. We will provide any applicable recommendations in relation the site plan and building plan <br />layout. <br /> <br />Meetin2s: <br />1. One initial meeting to become familiar with the site and the project in general. A copy of the <br />Schematic Design package will be available and provided during the meeting. <br />2. One follow-up meeting to review Consultants Report and discuss recommendations. This <br />meeting will also function as a "brainstorming" session in order to determine the best venues and <br />attractions for the project. <br /> <br />Feasibility Study for a Proposed Aquarium at Sunny Isles, Florida <br /> <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.