My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Metric Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
Metric Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2010 4:33:14 PM
Creation date
11/16/2010 4:09:10 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Client: <br />Town of Palm Beach Public Works Department <br />Owner's Representative: <br />James Bowser, P.E. <br />951 Old Okeechobee Road <br />West Palm Beach, FL 33401 <br />561-838-5440 <br />Design Cost: Varies <br />Project Status: <br />Begin and End Dates: January 2001 - January 2005 <br /> <br />Project Name: 12" WATER MAIN EXTENSION (City of Dania Beach along Dania <br />Beach Boulevard) <br />Location: Dania Beach Boulevard, Broward County <br />Description: <br />Metric is currently finalizing the design and construction <br />contract plans for the installation of approximately 4,280 LF <br />of a 12" potable water main to replace an existing 6" main <br />for the City. Utility improvements were originally included in <br />a Joint Project Agreement between the City and FOOT. In <br />order to expedite the City's need to provide additional water <br />service to adjacent residential development, Metric <br />Engineering was contracted to design the water main for <br />immediate installation while accommodating planned <br />roadway improvements including storm sewer systems and <br />sanitary sewer relocations. The design included relocation <br />of all existing water service connections as well as selection <br />of pipe materials to resist corrosion in the elevated water <br />table within the project corridor. Project construction plans included significant traffic <br />control plans to safely permit open-trench construction while managing high-volume <br />traffic from the beach area and the Dania Jai-Alai facility. Metric Engineering was also <br />responsible for securing Right-of-Way Occupation Permits from FOOT and permits from <br />Broward County Department of Environmental Protection and Health Department. <br />Client: City of Dania Beach <br />Owner's Representative: <br />Dominic Orlando, P.E. <br />Public Service Department <br />100 W. Dania Beach Boulevard <br />Dania Beach, FL 33004 <br />954-924-3740 <br />Design Cost: $20,000 <br />Project Status: January 2006- August 2006 <br /> <br /> <br />Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.