My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Metric Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
Metric Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2010 4:33:14 PM
Creation date
11/16/2010 4:09:10 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I;b~... <br />. <br /> <br /> <br />..... <br /> <br />~:I~Imr:J. <br /> <br />20. EXAMPLE <br />PROJECT KEY <br />NUMBER <br /> <br />21.TITLE AND LOCATION (City and State) <br />12" WATER MAIN EXTENSION (City of Dania Beach along Dania <br />Beach Boulevard) <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (if Applicable) <br />2006 <br /> <br />a. PROJECT OWNER <br />City of Dania Beach <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />b. POINT OF CONTACT NAME c. POINT OF CONTACT PHONE NUMBER <br />Dominic Orlando, PE 954-924-3740 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />Design and construction contract plans for the installation of approximately 4,280 LF of a 12" potable water main to <br />replace an existing 6" main for the City. Utility improvements were originally included in a Joint Project Agreement <br />between the City and FDOT. In order to expedite the City's need to provide additional water service to adjacent <br />residential development, Metric Engineering was contracted to design the water main for immediate installation while <br />accommodating planned roadway improvements including storm sewer systems and sanitary sewer relocations. The <br />design included relocation of all existing water service connections as well as selection of pipe materials to resist <br />corrosion in the elevated water table within the project corridor. Project construction plans included significant traffic <br />control plans to safely permit open-trench construction while managing high-volume traffic from the beach area and the <br />Dania Jai-Alai facility. Metric Engineering was also responsible for securing Right-of-Way Occupation Permits from FDOT <br />and permits from Broward County Department of Environmental Protection and Health Department. Metric's Fee: <br />$20,000 <br /> <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />c <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f <br /> <br />STANDARD FORM 330 (6/2004) PAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.