<br />CJI:>> PROPOSED PERSONNEL & QUAUFICATIONS
<br />
<br />CONTACT PERSON: Stephen C. Smith, P.E., Senior Vice President & COO
<br />7777 Glades Road, Suite 410, Boca Raton, Fl33434
<br />(305) 940-4661; (954) 782-8222; (561) 314-4445
<br />(954) 815-4111 cell
<br />
<br />Stephen C. Smith, P.E., Senior Vice President & COO, responsibilities include management of daily business
<br />operations for 40+ member civil engineering and surveying firm with gross sales of $5.5+ million. Oversee all areas
<br />of business including engineering, surveying, construction management services, accounting and human resources.
<br />Specifically oversees all transportation/ roadway projects including studies, reports and design. Ensure proper
<br />allocation of resources, staffing, financial management, quality control and timely project completion.
<br />
<br />Gene R. Schriner, P.E., President, is part of the Quality Assurance Team and is responsible for the business
<br />development of the 40+ member civil engineering and surveying firm with gross sales of $5.5 Million. Mr. Schriner
<br />initiates business development opportunities and client coordination. Also supervises and manages the
<br />Governmental and Utility Consulting Department. Mr. Schriner is involved with the conceptual design and planning of
<br />water and wastewater treatment projects ranging in size from 1.0 MGD up to 10.0 MGD.
<br />
<br />Orlando Rubio, P.E., Senior Supervising Engineer, is a designer of various surface water management systems
<br />with established criteria, engineering principles, and normal construction practices. Mr. Rubio conducts field and
<br />office visits with clients, permitting agency staff, and other project coordination as necessary. Mr. Rubio worked
<br />for Broward County in the Water Resources Division. Mr. Rubio has extensive experience reviewing complex
<br />surface water management license applications consisting of administrative and legal data, engineering reports,
<br />computer program output and construction plans. Mr. Rubio conducted review in accordance with established
<br />criteria, engineering principles, and normal construction practices to produce a written report in a prescribed
<br />format. Mr. Rubio coordinated reviews with the SFWMD, FDEP and/or County agencies and the delegation of the
<br />Environmental Resource Permitting program for Broward County from SFWMD and FDEP.
<br />
<br />Peter A. Kunen, P.E., Project Manager, has over ten (10) years of experience as a Project Engineer/Manager in
<br />design and construction services in water, sewer projects and stormwater pump stations. He coordinates water
<br />and wastewater permitting. Mr. Kunen has worked with several municipalities such as City of Margate, City of
<br />Okeechobee, City of Tamarac, Town of Pembroke Park, City of North Miami and Village of Bal Harbour.
<br />
<br />Matthew G. Harold, P.E., Supervising Engineer, has over eleven years of engineering experience. His background
<br />includes project management of various private site work development of municipal design projects including: water,
<br />sanitary sewer (including master plans), storm drainage (including master plans), parking area, roadway and
<br />feasibility studies.
<br />
<br />AI Caruso, E.I., Project Engineer, is responsible for the design of various components of land development
<br />engineering projects including design, calculations, cost estimates and certifications, feasibility studies and Phase I
<br />environmental site assessments.
<br />
<br />Robert D. Keener, P.S.M., Vice President of Surveying, has been licensed in the State of Florida for 18 years
<br />and with over 29 years of surveying experience such as utility and stormwater master planning. As Vice President
<br />of the CAS Survey Division, Mr. Keener heads a qualified survey staff that includes both CADD and field personnel.
<br />His staff is proficient with the latest survey technology available to the industry including AutoCAD Civil3D 2010.
<br />Mr. Keener was also responsible for creating Route Surveys used for engineering design for many municipalities
<br />including Bal Harbour Village, Town of Golden Beach, City of Sweetwater, Town of Pembroke Park, City of Oakland
<br />Park, City of South Bay, City of Pahokee and the City of Okeechobee.
<br />
<br />Michael Sarver, P.S.M., Project Surveyor, has over 34 years experience and is responsible for supervising survey
<br />field crews and survey technicians for the preparation of boundary surveys, right-of-way surveys, plats, legal
<br />descriptions and sketches, earthwork computations, as-built surveys and construction surveying.
<br />
<br />CRAIG A. SMITH & ASSOCIATES
<br />
<br />ENGINEERS. SURVEYORS. UTILITY LOCATORS. GRANT SPECIALISTS
<br />
<br />8
<br />
|