Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(complete one Section E for each key person.) <br /> <br />12. NAME <br />Stephen C. Smith, P.E. <br /> <br />13. ROLE IN THIS CONTRACT <br />Project Director <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />32 30 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Craig A Smith & Associates, Inc. <br />Boca Raton, FL <br /> <br />16. EDUCATION (DEGREE AND SPECIALlZA nON) <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />B.S. Civil Engineering, 1988 <br />Auburn University, Auburn, AL <br /> <br />Professional Engineer <br />State of Florida <br />License No. 48914 <br /> <br />B.S. Building Construction, 1986, <br />Auburn University, Auburn, AL <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organization, Training, Awards, etc.) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (CITY AND STATE) 2 YEAR COMPLETED <br /> Stormwater Master Plan PROFESSIONAL SERVICES l;ONSTRUCTION (IF APPLICABLE) <br /> 2009 On-going <br /> Golden Beach, FL <br />a. 3) BRIEF DESCRIPTION (brief scope, size, cost, etc.) AND SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> Project Director: <br /> Preparation of a six-phase master plan and construction plans for the Town of <br /> Golden Beach. <br /> (1) TITLE AND LOCATION (CITY AND STATE) 2 YEAR COMPLETED <br /> Stormwater Master Plan PROFESSIONAL SERVICES ONSTRUCTION (IF APPLICABLE) <br /> 2000-2010 On-going <br />b. Sweetwater, FL <br /> (3) BRIEF DESCRIPTION (briefscope, size, cost, etc.) AND SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> Project Director: <br /> Preparation of master plan and construction plans for the City of Sweetwater. <br /> (1) TITLE AND LOCATION (CITY AND STATE) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES l;ONSTRUCTION (IF APPLICABLE) <br /> Stormwater Master Plan 2006-2010 On-going <br />c. EI Portal, FL <br /> (3) BRIEF DESCRIPTION (briefscope, size, cost, etc.) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> Project Director: <br /> Preparation of multi-phase master plan and construction plans for the Village of <br /> EI Portal. <br /> 1) TITLE AND LOCATION (CITY AND STA TE) (2) YEAR COMPLETED <br /> Stormwater Master Plan PROFESSIONAL SERVICES ONSTRUCTION (IF APPLICABLE) <br /> 2008 On-going <br />d. Oakland Park, FL <br /> (3) BRIEF DESCRIPTION (brief scope, size, cost, etc.) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> Project Director: <br /> Preparation of master plan and construction plans for City of Oakland Park. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />