Laserfiche WebLink
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />21. Title and Location (City and State) <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER: <br />3 <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAl CONSTRUCTION <br />SERVICES (If Applicable) <br /> <br />Stormwater Master Plan and Construction Plans <br />Pembroke Park, FL <br /> <br />On-going On-going <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER: b. POINT OF CONTACT NAME: c. POINT OF CONTACT TELEP <br />Town of Pembroke Park Dr. Robert Levy, Town Administrator (954) 966-4600 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost): <br /> <br />SCOPE/SIZE: <br />The primary objective of the study was to compile a comprehensive stormwater <br />master plan for the entire Town of Pembroke Park. To identify and determine <br />corrective actions required to resolve existing flooding conditions through best <br />management practices in the development of new and retrofitted stormwater <br />systems. <br /> <br />COST: <br />$ 5,000,000+ (Planning, Design & Construction Services) <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />A CRAIG A. SMITH & ASSOCIATES Pompano Beach, FL Project Director <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />B <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />C <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />D <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />E <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />F. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 3 <br />