My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Assoc. #2
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
Craig A. Smith & Assoc. #2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2011 4:14:08 PM
Creation date
11/16/2010 4:39:54 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />21. Title and Location (City and State) <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER: <br />6 <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION <br />SERVICES (If Applicable) <br /> <br />1-95 Pump Station <br />Pembroke Park, FL <br /> <br />2004 <br /> <br />2006 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER: b. POINT OF CONTACT NAME: c. POINT OF CONTACT TELEP <br />Town of Pembroke Park Dr. Robert Levy, Town Administrator (954) 966-4600 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost): <br /> <br />SCOPE/SIZE: <br />FDOT Corridor Drainage Project, 1-95/Pembroke Park Road. Project includes 84- <br />inch drainage pipes; micro-tunneling; pump station with four (4) pumps (200 HP <br />motors) each capable of 40 CFS; ditch construction and C-l0 canal dredging. This <br />project was on a fast track from preliminary design to construction; completion <br />took only 25 months. CAS was responsible for planning design, permitting, <br />bidding, construction management and construction observation services. <br /> <br />COST: <br />$11,373,504 (Planning, Design & Construction Services) <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />A CRAIG A. SMITH & ASSOCIATES Pompano Beach, FL Project Director <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />B <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />C <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />D <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />E <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />F. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.