My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Assoc. #2
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
Craig A. Smith & Assoc. #2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2011 4:14:08 PM
Creation date
11/16/2010 4:39:54 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />21. Title and Location (City and State) <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER: <br />10 <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION <br />SERVICES (If Applicable) <br /> <br />Airglades Airport <br />Industrial Park <br />Hendry County, FL <br /> <br />2004 <br /> <br />2004-2005 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER: b. POINT OF CONTACT NAME: c. POINT OF CONTACT TELEP <br />Airglades Airport Judi Kennington-Korf, (863) 675-5220 <br /> Assistant County Administrator <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost): <br /> <br />SCOPE/SIZE: <br />Design, preparation of construction plans and contract documents, assistance <br />during bidding, construction management, construction observation and <br />assistance in securing funding for the project. <br /> <br />Community Development Block Grant (CDBG) Project. Construction of one (1) <br />mile + /- gravity sewer, master pump station, 350,000 gallon water storage tank <br />and pumping facility, two (2) miles +/- of water distribution main, 0.75 miles +/- <br />of force main, 25,000 gallons per day wastewater treatment plan and spray <br />irrigation system. <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />A CRAIG A. SMITH & ASSOCIATES Pompano Beach, FL Project Director <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />B <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />C <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />D <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />E <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />F. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.