My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Caine Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
Project Caine Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2010 9:08:15 AM
Creation date
11/17/2010 9:03:57 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TO .e'Ct"TCAINE <br /> <br />~rJ~ <br /> <br />Owner <br />Florida International University <br /> <br />Contact <br />Bob Griffith <br />305.348.4002 <br /> <br />Scope <br />Mechanical, Electrical, Plumbing <br />and Fire Protection Engineering <br /> <br />Completion Date <br />Ongoing <br /> <br />Project Caine, Inc. <br />1948 East Sunrise Blvd. <br />Suite 1 <br />Fort Lauderdale, FL 33304 <br />Phone: 954.767.8886 <br />Fax: 954.767.9934 <br />E-fax: 954.337.4665 <br /> <br />Project Caine, Inc. provided services on numerous small renovations at the <br />university which included laboratories, gymnasiums, offices and classrooms. <br /> <br />Projects to date furnished under this contract: <br /> <br />. FlU Engineering Building Roof Fans <br />Completion Date (actual or estimated): 2008 <br />Total Cost of Project: $200,000.00 <br /> <br />. FlU ECS Lab 162 Renovation <br /> Completion Date (actual or estimated): 2008 <br /> Total Cost of Project: $200,000.00 <br />. FlU Engineering Lab E109 <br /> Completion Date (actual or estimated): 2008 <br /> Total Cost of Project: $250,000.00 <br />. FlU Fire Alarm System Upgrade <br /> Completion Date (actual or estimated): 2008 <br /> Total Cost of Project: $300,000.00 <br />. FlU Football Stadium <br /> Completion Date (actual or estimated): 2009 <br /> Total Cost of Project: $2,500,000.00 <br />. FlU Green Library Minor Renovation <br /> Completion Date (actual or estimated): 2008 <br /> Total Cost of Project: $50,000.00 <br />. FlU Office Renovations <br /> Completion Date (actual or estimated): 2007 <br /> Total Cost of Project: $1,000,000.00 <br />. FlU Recreational Facility <br /> Completion Date (actual or estimated): 2007 <br /> Total Cost of Project: $1,000,000.00 <br /> <br />T responsive engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.