My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Nutting Engineers #3
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
Nutting Engineers #3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2011 4:14:47 PM
Creation date
11/17/2010 9:33:05 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br /> Richard C. Wohlfarth, P.E. Principal/ Director of Engineering a. TOTAL I b. WITH CURRENT FIRM <br /> 20 15 <br />15. FIRM NAME AND LOCATION (City and State) <br /> Nutting Engineers of Florida, Inc. <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> University of Florida - B.S. Civil Engineering Florida Professional Engineer #50858 <br /> Registered Building Inspector BN #3580 <br /> SBCCI #6528 <br /> ACI Level I, UBCI <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Ttaining. Awards. etc.) <br /> State Certified Building Inspector, UBCI Certification, ACI Level I, Florida Engineering Society, Treasure Coast <br /> Chapter and Broward Chapter (Past President), Treasure Coast Builders Association, Red Cross First Aid and CPR <br /> 19. RELEVANT PROJECTS <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Cudjoe Key Waste Water Transmission Main PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Florida Keys, FL 2008 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE .L Check if project perlormed with current firm <br />a. Nutting performed geotechnical engineering and exploration services - standard penetration test <br /> borings plus drilling on hydraulic spud barge, SWFMD exfiltration tests, soil c1assifiation and <br /> laboratory analysis, sieve analysis. The scope of work included the construction of a regional <br /> waste water transmission system consisting of 87,000 lineal feet of transmission main pipeline <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> FKAA Lower Keys Waste Water Collection System PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Florida Keys, FL 2008 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE :{"j Check if project perlormed with current firm <br />b. Nutting performed geotechnical engineering and exploration services - standard penetration test <br /> borings plus drilling on hydraulic spud barge, SWFMD exfiltration tests, soil c1assifiation and <br /> laboratory analysis, sieve analysis. The scope of work included performing one 15' spt at <br /> approximately 51 lift stations and 44, 10' spts along the gravity sewer line routes. The gravity <br /> (1) TITLE AND LOCATION(City and State) (2) YEAR COMPLETED <br /> Ft Lauderdale International Airport Master Plan PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Fort Lauderdale, FL 2008 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project perlormed with current firm <br />C. Geotechnical engineering & exploration services, soil and groundwater testing/analysis, <br /> construction materials testing. Testing included standard penetration test borings, auger <br /> borings, shelby tubes, SFWMD exfiltration tests, double ring infiltration tests, soil suction <br /> (tension meter) tests, manual test borings, sieve analysis with hydrometer, specific gravity, and <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Key West Class I Solid Waste Transfer Station PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Rockland Key, FL est 2009 est 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE L Check if project perlormed with current firm <br />d. Geotechnical engineering and exploration services, construction materials testing, and threshold <br /> inspection services <br /> $200,000 <br /> Director of Engineering <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Palmetto Park Road & C-1 Canal Culvert Replacement Prj. PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> #2003907 2007 2007 <br /> (3\ BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE L Check if project perlormed with current firm <br />e. Construction materials testing including soil densities for basecourse, backfill, pipe backfill, curb <br /> pads, storm drain pipe backfill and modified proctor densities tests. <br /> $2,300 <br /> Director of Engineering <br /> <br />STANDARD FORM 330 (6/2004) PAGE E-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.