My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Nutting Engineers #3
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
Nutting Engineers #3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2011 4:14:47 PM
Creation date
11/17/2010 9:33:05 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Comp/ete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Richard C. Wohlfarth, P.E. Director of Engineering/ Principal-In-Charge a. TOTAL I b. WITH CURRENT FIRM <br /> 20.1 15.4 <br />15. FIRM NAME AND LOCATION (City and State) <br />Nutting Engineers of Florida, Inc. <br />16. EDUCATION (DEGREE AND SPECIALlZA TlON) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />University of Florida - B.S. Civil Engineering Florida Professional Engineer #50858 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training. Awards. etc.) <br /> State Certified Building Inspector <br /> UBCI Certification <br />ACI Level 1 <br /> 19. RELEVANT PROJECTS <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Cudjoe Key Waste Water Collection System PROFESSIONAL SERVICES I CONSTRUCTION (/I applicable) <br /> Cudjoe Key, FL 2007 2007 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE ~~ Check if project performed with current firm <br />a. Geotechnical engineering and exploration services <br /> $15,000 <br /> Director of Engineering/Project Engineer <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> FKAA Lower Keys Waste Water Collection System PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) <br /> Florida Keys, FL 2008 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE l{J Check if project performed with current firm <br />b. Nutting performed geotechnical engineering and exploration services - standard penetration test borings plus drilling on <br /> hydraulic spud barge, SWFMD exfiltration tests, soil classifiation and laboratory analysis, sieve analysis. The scope of <br /> work included performing one 15' spt at approximately 51 lift stations and 44, 10' spts along the gravity sewer line <br /> routes. The gravity sewer lines encompass approximately 150,000 lineal feet. <br /> $23,000 <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Ft. Lauderdale International Airport Master Plan PROFESSIONAL SERVICES I CONSTRUCTION (/I applicable) <br /> Fort Lauderdale, FL 2008 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE l{J Check if project performed with current firm <br />C. Geotechnical engineering & exploration services, soil and groundwater testing/analysis, construction materials testing. <br /> Testing included standard penetration test borings, auger borings, shelby tubes, SFWMD exfiltration tests, double ring <br /> infiltration tests, soil suction (tension meter) tests, manual test borings, sieve analysis with hydrometer, specific gravity, <br /> and natural moisture content. <br /> $48,155.00 <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Key West Class I Solid Waste Transfer Station PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Rockland Key, FL 2009 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE l{J Check if project performed with current firm <br />d. Geotechnical engineering and exploration services, construction materials testing, and threshold inspection services <br /> for the construction of a new Class I Solid Waste Transfer Station and associated buildings, ramps and scales. <br /> $200,000 <br /> Director of Engineering <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Atlantic Isle Utility & Roadway Improvements PROFESSIONAL SERVICES I CONSTRUCTION (/I applicable) <br /> City of Sunny Isles, FL 2007 2007 <br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />e. Geotechnical engineering/exploration services and various laboratory testing <br /> $5,300 <br /> Director of Engineering <br /> <br />STANDARD FORM 330 (612004) PAGE E-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.