My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Nutting Engineers #3
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
Nutting Engineers #3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2011 4:14:47 PM
Creation date
11/17/2010 9:33:05 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 p:ojects, if not specified. <br />Como/ete one Section F for each oroiect.] <br />21. TITLE AND LOCATION (City and State) <br />South Point ROW, Phases III, IV & V Right of Way Infrastructure Improvements <br />Miami Beach, Florida <br /> <br />20. EXAMPLE PROJECT <br />KEY NUMBER <br />10 <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />11/2006 11/2006 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER <br />Chen and Associates <br /> <br />b. POINT OF CO NT ACT <br />Mr. Oscar Bello, PE <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />786-497-1500 x-104 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT <br /> <br />Improvements included the installation of <br />underground utilities (water main and stormwater <br />drainage) within the public right-of-way (ROW)as <br />well as the reconstruction (improvement) to the <br />affected roadways. The project entailed <br />approximately 19,000 If of roadway. <br /> <br />Nutting was also involved for another client (Calvin <br />Giordano and Associates) in the Miami Beach <br />Right-of-Way Infrastructure Improvements, which <br />included the replacement of -40,000 If of 8-12 inch <br />diameter water mains, re-milling of roadways, the <br />installation of street scapes including the curbing, <br />islands, lighting and parallel parking. <br /> <br />Nutting's services included the performance of <br />geotechnical engineering services and construction <br />materials testing that included nuclear density tests <br />and apshalt cores as wellas various laboratory <br />testing for the South Point Right of Way <br />Infrastructure inprovements - Phases III, IV and V for <br />the City of Miami Beach. <br /> <br />Nutting worked as a subconsultant for Chen and <br />Associates, but also holds a geotechnical <br />engineering and materials testing contract with the <br />City of Miami Beach. <br /> <br />Nutting's fees $25,000 <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. Nutting Engineers of Florida, Miami, Florida Geotechnical Engineers and Testing <br /> Inc. Firm <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />C. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br /> <br />STANDARD FORM 330 (6/2004) PAGE F-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.