<br />12, NAME
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13, ROLE IN THIS CONTRACT
<br />
<br />Manuel R. Sanchez, P.E.
<br />Director of Structural Design
<br />15, FIRM NAME AND LOCATION (City and State)
<br />Beiswenger, Hoch & Associates, Inc" 510 Shotgun Road, Suite 400, Sunrise, FL 33326
<br />16. EDUCATION (DEGREE AND SPECIALlZA nON) 17,
<br />
<br />Structural Designer
<br />
<br />14. YEARS EXPERIENCE
<br />a, TOTAL 371b WITH CURRENT FIRM 37
<br />
<br />CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
<br />
<br />B,S,C,E, /1973 / New College of Engineering Professional Engineer Florida 27510 (1980)
<br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training. Awards, etc,)
<br />
<br />American Society of Civil Engineers, American Segmental Bridge Institute, American Concrete Institute, PrecasUPrestressed Concrete Institute
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) 121 YEAR COMPLETED
<br /> Newport Fishing Pier PROFESSIONAL SERVICES) I~ONSTRUCTION (If applicable)
<br /> City of Sunny Isles Beach, FL 2010 Under Final Review by City
<br />a. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />Engineer of Record and Chief Structural Designer of the 602 foot long Newport Fishing Pier located in Sunny Isles Boulevard and Collins Aveue,
<br /> The Structural Plans are completed and under review, Engineer Cost Estimate $4,5 M,
<br /> 11) TITLE AND LOCATION (City and State) 121 YEAR COMPLETED
<br /> The North Bay Road Pedestrian & Emergency Vehicle Bridge, Extension of North Bay Road PROFESSIONAL SERVICES)I~ONSTRUCTION (If applicable)
<br /> from 172nd to 174th Street, City of Sunny Isles Beach, FL 2010 Under final review by City
<br /> 13) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE lXJ Check if project performed with current firm
<br />b. Engineer of Record and Chief Structural Designer, The bridge is under the final design phase and is composed of five (5) simple supported spans
<br /> with new Florida 1-36 beams with exterior haunch beams, Engineer Cost Estimate $1,9 M.
<br /> 11) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Gwen Margolis Park PROFESSIONAL SERVICESllCONSTRUCTION (If applicable)
<br /> City of Sunny Isles Beach 2009 2009
<br />C. 13) BRIEF DESCRIPTION (Brief scope. size. cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />Engineer of Record and Chief Structural Designer of the foundation mounted on Augercast Piles for the Prefabricated BR Building, Cost $75,000
<br /> 11) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> NW 21 st Avenue Pedestrian Bridge over C-13 Canal PROFESSIONAL SERVICES ICONSTRUCTION (If applicable)
<br /> Broward County, FL 2008-2009 Under Construction
<br />d. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />Engineer of Record and Chief Structural Designer of this tubular truss pedestrian bridge with concrete deck and approach ramps meeting ADA
<br /> requirements, This structure gives full accsess to school/pedestrian access,
<br /> (1) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED
<br /> Pedestrian Bridge over Dressel's Dairy Canal PROFESSIONAL SERVICES 31CONSTRUCTION (If applicable)
<br /> Miami-Dade County, FL 2003 2004
<br /> 13) BRIEF DESCRIPTION (Brief scope. size, cost, etc,) AND SPECIFIC ROLE lXJ Check if project performed with current firm
<br />e. Engineer of Record and chief Structural Designer of this tubular truss pedestrian bridge with concrete deck and approach ramps meeting ADA
<br /> requirements. Cost $340,000,
<br />
<br />STANDARD FORM 330 (62004) PAGE 2
<br />Continuation Sheet
<br />
|