My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BHA #4
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
BHA #4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2011 4:15:23 PM
Creation date
11/17/2010 9:36:42 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />12, NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.; <br />13. ROLE IN THIS CONTRACT <br /> <br />Patrick Hayes, B.S.C.E. <br />15. FIRM NAME AND LOCATION (City and State) <br />Beiswenger, Hoch & Associates, Inc" 510 Shotgun Road, Suite 400, Sunrise, FL 33326 <br />16. EDUCATION (DEGREE AND SPECIALlZA nON) 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE! <br /> <br />Senior Field Engineer <br /> <br />14, YEARS EXPERIENCE <br />a, TOTAL 321b WITH CURRENT FIRM 25 <br /> <br />B,S,C,E, /1984/ Cornell University, Ithaca, New York <br /> <br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training. Awards, etc.) <br />A TSSA Worksite Safety Supervisor <br />Final Estimates, ACI <br /> <br />FOOT <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Central Island Drainage and Street Improvements PROFESSIONAL SERVICES i I~ONSTRUCTION (If applicable) <br /> City of Sunny Isles Beach 2008 Under Construction <br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />a. Project Manager / Senior Field Inspector for the roadway rehabilitation and drainage system <br /> (1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED <br /> SR 826 at NW 74th Street, South River Drive and Okeechobee Road PROFESSIONAL SERVICES II CONSTRUCTION (If applicable) <br /> FOOT 6 2003 2007 <br />b. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc,) AND SPECIFIC ROLE l2SJ Check if project performed with current firm <br />Project Administrator and Senior Field Inspector for this reconstruction project. Construction Cost $ 71 million <br /> 11) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 826 at NW 103rd Street, Reconstruction PROFESSIONAL SERVICESIICONSTRUCTION (If applicable) <br /> FDOT 6 1999 2003 <br />c. (31 BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Project Administrator for this reconstruction project. His duties included the supervision of a very complex MOT scheme whereby the original speed <br /> limit has been maintained with no daytime lane closures allowed, Cost $ 39 millions <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> 1-195/ SR 112 Bridge Widening from NE 1st Avenue to Biscayne Blvd, PROFESSIONAL SERVICES,ICONSTRUCTION (If applicable) <br /> FDOT 6 1997 1999 <br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />d. Senior Inspector/Assistant Project Engineer for this reconstruction project <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 395/MacArthur Causeway Reconstruction Project PROFESSIONAL SERVICES ~ICONSTRUCTION (If applicable) <br /> FOOT 6 1992 1993 <br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE 00 Check if project performed with current firm <br />e. Bridge Construction Engineer/Field Inspector for this project and consisted of the construction of two 2500 ft, long parallel bridges with two-cell <br /> segmental superstructures, The project required complex traffic control ensuring all passengers and goods are able to enter the Port through this <br /> single entrance, Cost: $ 17 millions <br /> <br />STANDARD FORM 330 (62004) PAGE 2 <br />Continuation Sheet <br />
The URL can be used to link to this page
Your browser does not support the video tag.