<br />12, NAME
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13, ROLE IN THIS CONTRACT
<br />
<br />Andres Ramiro Sanchez, CGC
<br />15, FIRM NAME AND LOCATION (City and State)
<br />Beiswenger, Hoch & Associates, Inc, 510 Shotgun Road, Suite 400, Sunrise, FL 33326
<br />16, EDUCATION !DEGREE AND SPECIALlZA nON) 17, CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
<br />
<br />Environmental Engineer / General Contractor /
<br />Field Inspector
<br />
<br />14. YEARS EXPERIENCE
<br />a. TOTAL Ib, WITH CURRENT FIRM
<br />
<br />271 8
<br />
<br />AA in Pre-Engineering, Miami-Dade Community College, Miami, FL 1982
<br />BS Environmental Engineering, University of Florida, Gainesville, FL 1985
<br />Drilling Rig Supervisor Title - Conoco Inc, Houston, TX 1990 General Contractor License CGC1510667 - FL 2005
<br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training, Awards, etc,)
<br />
<br /> 11l TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Vakharia Building Health Center PROFESSIONAL SERVICES)\CONSTRUCTION (If applicable)
<br /> Plantation, FL 2008 2009
<br />a. (3) BRIEF OESCRIPTION (Brief scope. size, cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />Project Manager / Field Superintendent on build-out project for the 11,000 SF of build-out and 2,000 SF of additional construction, Cost $1,3 M,
<br /> 11l TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> U,S, Department of Transportation - South FL Offices PROFESSIONAL SERVICES)ICONSTRUCTION (If applicable)
<br /> Sunrise, FL 2008 2009
<br /> 13) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />b. Project Manager / Field Superintendent on build-out project - 2,300 SF of build-out. Cost $230,000,
<br /> 11) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Jain Center Temple PROFESSIONAL SERVICESIICONSTRUCTION (If applicable)
<br /> Weston, FL 2007 2008
<br />c. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />Project Manager / Field Superintendent on build-out proect, which included detailed marble installation on walls and fioor, Cost $240,000,
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Concord Plaza Building / BHA & Bentley-GEOPAK New Headquarters PROFESSIONAL SERVICES! I CONSTRUCTION (If applicable)
<br /> Sunrise, FL 2002 2007
<br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />d. Field Superintendent on the (5) five story building construction project of 75,000 SF, Tilt-up walls were the heaviest-longest in the industry at the
<br /> time, In charge of safety and quality control. Project Manager/Field Superintendent on 7 build-out projects inside this five story building, which
<br /> included high security walls and electronic devices for the Department of Justice ($700,000) and the Department of Labor ($415,000).
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> The City of Sunny Isles Beach - Golden Shores Drainage and Street Improvements PROFESSIONAL SERVICES 1\ CONSTRUCTION (If applicable)
<br /> Sunny Isles Beach, FL 2001 2002
<br /> (3) BRIEF DESCRIPTION (Briel scope. size. cost. etc.) AND SPECIFIC ROLE l.XJ Check if project performed with current firm
<br />e. Civil Engineering Inspector responsible for preparation of daily reports and monthly budget estimates, coordination with City Manager, General
<br /> Contractor and Subcontractors, Flooding problems were solved in the neighborhood, Cost $3.5 M,
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />STANDARD FORM 330 (6 2004) PAGE 2
<br />Continuation Sheet
<br />
|