|
<br /> E. RESUMES OF KEY PERSONNEL
<br /> (Complete one Section E for each key person)
<br />12. NAME: 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Joseph A Styrsky, PE Mechanical Engineer I ~ WITH CURRENT FIRM
<br /> a. TOTAL
<br /> 33
<br />15. FIRM NAME AND LCOATION (CITY AND STATE)
<br />Wolfberg Alvarez & Partners, Inc" 1500 San Remo Ave., Ste. 300, Coral Gables, FL 33146
<br />16. EDUCATION (DEGREE & SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE & DISCIPLINE)
<br />1966/Bachelor of Science/Mechanical Engineeringllllinois Institute 1977 / PE No, 24125
<br />of Technology
<br />18. OTHER PROfESSIONAL QUALlFICA liONS (Publications, Organizations, Training, Awards, Ete.)
<br />Mr. Styrsky has over 30 years of experience, offering expert knowledge in the design of mechanical systems in South Florida. As Sen-
<br />ior Engineer Mr. Styrsky has been responsible for mechanical/HVAC design for a diverse group of building types.
<br /> 19. RELEVANT PROJECTS
<br />a. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
<br /> General Consultant Contract for Village of Pinecrest, Pinecrest, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> 2002 2004
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Mechanical Engineer for MEP services for the new Pinecrest Municipal Center, Village Hall and Police Department as part of a General
<br />Consulting Contract. The new facility is home to the Village of Pinecrest's Village Hall and Police Department. The Municipal Center
<br />serves as the Village's seat of government and houses the Village's Building and Zoning Department, as well as their Police Station.
<br />X Check if Project performed with current firm.
<br />b. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
<br /> Technical Review Services Consultant (TRSC) and Uniform Build- PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> ing Code Inspector (UBCI), Miami-Dade County, FL. 2002-2003 2003
<br />(3) BRIEF DESCRIPTION (Brief Scope, size. cost, etc.) AND SPECIFIC ROLE
<br />Mechanical Engineer for four separate contracts with the School Board of Miami-Dade County to determine compliance with all
<br />applicable standards, codes and regulations. Various projects ranging is cost from $100,000 to $1,000,000.
<br />X Check if Project performed with current firm.
<br />c. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
<br /> City of Miami General Consulting Contract, Miami, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> 2008-2010 2008-2010
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Mechanical Engineer for various task orders that include mechanical, electrical and plumbing upgrades. Project includes a ne roofing
<br />system and site improvements including a new parking lot with drainage and fencing for security, Other tasks include ADA upgrades to
<br />building around the City, Project cost varies from $50,000 to $250,000,
<br />X Check if Project performed with current firm.
<br />d. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
<br /> General AlE Consulting for the Village of Palmetto Bay. Palmetto PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> Bay, FL 2006 2009
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROL
<br />Mechanical Engineer for multi-disciplined engineering and architectural support services the City for a variety of projects. This included
<br />Preparation of studies and reports, planning, design of building additions and improvements, upgrading of engineering systems, site
<br />planning and improvements, Preparation of construction documents, Construction phase services.
<br />X Check if Project performed with current firm.
<br />e. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
<br /> North Shore Medical Center Campus Wide Additions and Improve- PROFESSIONAL SERVICES
<br /> ments, Miami, FL I CONSTRUCTION (If Applicable)
<br /> 1999-2001 2001
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Mechanical Engineer for campus-wide additions and improvements. Projects included master planning. additions. renovations, engi-
<br />neering upgrades. new construction and CADD services.
<br />X Check if Project performed with current firm.
<br />
<br />Wolfberg Alvarez and Partners
<br />
<br />STANDARD FORM 330 (1/2004)
<br />
|