Laserfiche WebLink
<br /> E. RESUMES OF KEY PERSONNEL <br /> (Complete one Section E for each key person) <br />12 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Jorge Fleitas, PE, RCCD Electrical Engineer a. TOTAL I ~. WITH CURRENT FIRM <br /> 24 <br />15. FIRM NAME AND LeQATION (CITY AND STATE) <br />Wolfberg Alvarez & Partners, Inc., 1500 San Remo Ave., Ste, 300, Coral Gables. FL 33146 <br />16. EDUCATION (DEGREE & SPECIALIZATION) I 17. CURRENT PROFESSIONAL REGISTRATION (STATE & DISCIPLINE) <br />Bachelor of Science, Electrical Engineering, University of Havana Florida/#55340 <br />1986, Cuba <br />18. OTHER PROFESSIONAL QUALIfiCATIONS (Publications, Organizations, Training, Awards, Etc.) <br /> 19. RELEVANT PROJECTS <br />a. (1) TITLE AND LOCATION (City and State) I (2) YEARS COMPLETED <br /> Camillus House Center, Miami, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> 2007 2010 <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE <br />Electrical Engineer for a new center focused on expanding the knowledge-base surrounding homeless issues, and improving the ca- <br />pacity and effectiveness of individuals, organizations, and systems serving persons experiencing homelessness, The campus will <br />include multiple buildings, totaling 215,000 SF. 340 beds. and the most complete range of social and clinical services available in <br />South Florida to serve an estimated 4,300 individuals each year. <br />X Check if Project performed with current firm. <br />b. (1) TITLE AND LOCA liON (City and State) I (2) YEARS COMPLETED <br /> Broward General Hospital, Fl. Lauderdale, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> 2008 2009 <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE <br />Electrical project engineer for the renovation of 5,000 SF of office space into three different doctor's offices. The current HVAC system <br />was converted from constant volume to a VAV system with the necessary control for temperature and humidity control. The current <br />lighting, power and communication system was removed and replaced with new equipment and systems according with client needs. <br />Check if Project performed with current firm. <br />c. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED <br /> City of Sunrise Corporate Park, Gateway West office Building, Sun- PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> rise, FL 2007 2009 <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE <br />Electrical project engineer for the 3 story LEED Certified office building, The systems incorporated into the design were OX-split sys- <br />tems with VAV for enhanced temperature and humidity control. The Core of the office building had a dedicated system to ensure posi- <br />tive building pressurization. The surrounding tenant spaces had dedicated HVAC systems for enhanced individual thermal comfort <br />control capability. SGM was responsible the site lighting and positioned and selected the light poles and light fixture types to prevent <br />light spill over. <br />Check if Proiect performed with current firm. <br />c. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED <br /> Sunset Elementary Classroom Building Addition, Remodeling and PROFESSIONAL SERVICES I CONSTRUCTION (If Appncable) <br /> Renovations. Miami. FL 2009 2010 <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE <br />Electrical engineering for a two-story, 24,000 SF addition with 19 classrooms housing 418 students, The projects includes a PE shel- <br />ter, state-of-the-art Media Center. chiller plant, and parking expansion. The campus will be occupied during construction. <br />X Check if Project performed with current firm. <br />e. (1) TITLE AND LOCATION (City alld State) (2) YEARS COMPLETED <br /> Vizcaya Museum and Gardens Miscellaneous Continuing PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> Contract, Miami, FL 2009 2010 <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE <br />Electrical Engineer for engineering services to the Historic Vizcaya Museum and Gardens. The projects under this contract include <br />Architectural restorations, re-roofing, re-painting, ADA enhancements, Electrical Upgrades. Stormwater Discharge Management Sys- <br />tem and new building construction. In addition to the project scope WA also is assisting in the bidding and permitting phase of the <br />project along with Construction Administration services, <br />X Check if Proiect performed with current firm. <br /> <br />Wolfberg Alvarez and Partners <br /> <br />STANDARD FORM 330 (1/2004) <br />