My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McMahon Transportation
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
McMahon Transportation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2010 11:36:27 AM
Creation date
11/17/2010 11:36:18 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />21. TITLE AND LOCATION (City and State) <br /> <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />7 <br /> <br />Transportation Engineering Services, Martin County, Florida <br /> <br />22. YEAR COMPLETED <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2009 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER <br />Martin Count <br /> <br />b. POINT OF CONTACT NAME <br />Lisa Wichser, P.E. <br /> <br />C. POINT OF CONTACT TELEPHONE NUMBER <br />(772) 288-5927 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />This is a task order based continuing services contract that can include transportation planning, traffic engineering and <br />roadway/traffic signal design. Four task work orders have been issued to date. The first two task orders included a license <br />plate survey, traffic study and application for a Level of Service Variance for State Road 710IWarfield Boulevard in western <br />Martin County. This project required multiple meetings with Florida Department of Transportation Planning staff in order to <br />complete the analysis. The third and fourth work orders were specific to intersection data collection for the entire County. <br />Manual turning movement counts were performed at signalized and unsignalized locations for morning and afternoon peak <br />hours. Photographs of each approach of each of the intersections were provided. <br /> <br />Entire Project Cost $115,846 <br />Work for which Firm was/is responsible: $69,184 <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />C. <br /> <br />80 <br /> <br />STANDARD FORM 330 (1/2004) PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.