Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Comv/ete one Section E for each ket verson. ) <br /> <br />26 <br /> <br />14. YEARS EXPERIENCE <br />I b. WITH CURRENT ~IRM <br /> <br />12 NAME <br />DOUGLAS R. TAYLOR, PE <br /> <br />\3 ROLE IN TillS CONTRACT <br />Project Manager <br /> <br />a TOTAL <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Calvin, Giordano & Associates, Inc. - Fort Lauderdale, FL <br /> <br />16 EDUCATION (DfXiREE AND SPH'IAUZAllON) <br />BS Civil Engineering, University of Illinois (UIDe), 1984 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STA IE AND f)JSClPUNI,j <br />1988 (State of Illinois), 1996 <br /> <br />State of Florida <br /> <br />18 OTHER PROFESSIONAL QUALlFlCA liONS (Puhlicaliolls, Organizations, Training, Award\', etc.) <br /> <br />Mr. Taylor has been responsible for a multitude of municipal engineering and development projects throughout <br />Florida. This includes master design responsibility and oversight for a variety of projects. His goal is to instill <br />within his group the importance of diligent project manager-to-client communications, as well as project <br />manager-agency communications. Another prime focus has been the strong project schedule management, <br />allowing clients to focus on other matters of importance while remaining confident that their projects are in <br />capable hands. <br /> <br />Mr. Taylor has 26 years of experience in civil engineering and is a registered Professional Engineer in Florida, <br />Colorado, Illinois, Iowa and Wisconsin. He has managed at a single time, as many as 25 design professionals <br />within his office. In addition, he spent two years as a Vice President of Development for a major Florida retail <br />developer. <br /> <br />Mr. Taylor has performed a number of studies, design and permitting for roadway, and drainage on municipal, <br />commercial, institutional, recreational, and industrial projects in Florida, and the Caribbean. <br /> <br /> (I) TITLE AND LOCATION (CIty and Stale) (2) YEAR COMPLETED <br /> Assistant City Engineer PROFESSIONAL SERVICES I CONSTRUCTION (if appheah/e) <br /> Weston, Florida 2008/Present <br /> (3) BRIEF DESCRIPTION (Rriefscope. size. eosl, ele) AND SPECIFIC ROLE 181 Check if project performed with current firm <br />a. Responsible for Engineering DRC review, Engineering Construction Permits, and day to day engineering related issues <br /> for the City. In addition, manage larger projects dealing with roadways, drainage, water, and sewer for the City. <br /> (1) TITLE AND LOCATION (('I/yand Slate) (2) YEAR COMPLETED <br /> Site Plan and Engineering Permit Services for the City of West PROFESSIONAL SERVICES 1 CONSTRUCTION (if apphmh/e) <br /> Park, and City of Dania Beach. 2008/Present <br />b. (3) BRIEF DESCRIPTION (Bnefseope, size. cost, ete) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Site Plan review and development of reports for engineering aspects of Site Plan submittal packages, and attendance at <br /> DRC meetings as a City representative. Review and approval of Engineering Permits for construction. <br /> (1) TITLE AND LOCATION (CI/y and Slate) (2) YEAR COMPLETED <br /> City of Oakland Park, Community Redevelopment Area (CRA) PROFESSIONAL SERVICES 1 CONSTRUCTION (if appheah/e) <br /> Oakland Park, Florida 20042005 <br />c. (3) BRIEF DESCRIPTION (Bmfscope, size, cost, elc) AND SPECIFIC ROLE o Check if project performed with current firm <br /> As consultant Project Director for the CRA, planned, coordinated, and managed all projects within the CRA with the <br /> CRA Director, City Manager, and City staff. <br /> (1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED <br /> Griffin Road Expansion PROFESSIONAL SERVICES 1 CONSTRUCTION (if oppheable) <br /> West Palm Beach, Florida 2003 <br /> (3) BRIEF DESCRIPTION (Brief scope, si:e. cosl, elc) AND SPECIFIC ROLE o Check ifproject perfonned with current firm <br />d. Engineer of record and Project Manager for the milling and resurfacing of two miles of highway and the addition of <br /> two lanes of new roadway to create a four lane section. This involved the addition of water quality improvements. <br /> <br />19 RELEVANT PROJECTS <br />