<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />Com lete one Section E or each ke
<br />
<br />
<br />12, NAME
<br />JOHN MESSERIAN, PE
<br />
<br />13. ROLE IN THIS CONTRACT
<br />
<br />Civil Engineering
<br />
<br />a. TOTAL
<br />
<br />14 YEARS EXPERIENCE
<br />b. WITH CURRENT FIRM
<br />
<br />35
<br />
<br />6
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Calvin, Giordano & Associates, Inc. - Fort Lauderdale, FL
<br />
<br />16. EDUCATION {DEGREE AND SPECIALIZATION)
<br />Graduate Studies in Environmental Sciences, West
<br />Virginia College of Graduate Studies, 1973
<br />Bachelor of Science in Civil Engineering, Marshall
<br />University, 1971
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STA IE AND /J/SClI'l.lNI,j
<br />Professional Engineer, Florida
<br />No. 47810
<br />Professional Engineer, West Virginia
<br />No. 47810
<br />LLS, West Vir inia, No. 0495
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publicatians, Organizatians, Training, Awards, etc.)
<br />
<br />Mr. Messerian has over 35 years of professional experience in the project management, planning and design of
<br />municipal projects, commercial buildings, highways, and airports. His extensive experience with construction
<br />and thorough knowledge of codes, regulations as they apply to each development is an asset for any project. In
<br />addition, his reputation with the permitting agencies has perpetuated a long list of successful and profitable
<br />projects.
<br />
<br /> 19. RELEVANT PROJECTS
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Atlantic Isles Utility & Roadway Improvements PROFESSIONAL SERVICES I CONSTRUCTION (if applicahle)
<br /> Sunny Isles Beach, FL 2008/2009
<br /> (3) BRIEF DESCRIPTION (Briefscape, size, cast, etc.) AND SPECIFIC ROLE I8J Check if project performed with current firm
<br />a. Mr. Messerian served as project manager for this project that serves 62 residences on an island with new water mains,
<br />sanitary sewer, and under grounding of electrical power, cable television, and telephone. In addition, drainage
<br /> improvements including curb and gutter, retention areas, pollution retardant devices, and a stormwater collection
<br /> system were constructed. Services, such as electric power, water, and sewer were financed by the City at the current
<br /> rate of interest over a period of 15 years.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> North Shore Neighborhood Improvements PROFESSIONAL SERVICES I CONSTRUCTION (if applicahle)
<br /> Miami Beach, FL Present
<br /> (3) BRIEF DESCRIPTION (Briefscape, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br /> The project is located in the City of Miami Beach, in Miami-Dade County and consists of approximately 22,000 linear
<br />b. feet of roadway, swales, and sidewalks extending North Shore Neighborhood of Miami Beach. As project manager, Mr.
<br /> Messerian was responsible for the implementation of all the BOOR's components, from design development through
<br /> construction documentation and into construction management. . This involved the installation of medians and
<br /> planting strips within the Right-of-Way, reconstruction of curb & gutter, reconstruction of swales, drainage structures
<br /> and storm sewer, and sidewalks.
<br /> (I) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Surfside Storm water Master Plan PROFESSIONAL SERVICES I CONSTRUCTION (if applimhle)
<br /> Surfside, Florida 2008/2009
<br /> (3) BRIEF DESCRIPTION (Briefscape, size, cost, etc.) AND SPECIFIC ROLE I8J Check if project performed with current firm
<br />c. The project involved developing the Town of Surfside Stormwater Management Master Plan to address environmental
<br /> protection and reduce flooding within the Town. The Master Plan included the engineering analysis through modeling
<br /> of the stormwater management system to formulate the best approach to alleviate pollutant discharge loadings to
<br /> Biscayne Bay from the project site and also to improve the hydraulic performance of the existing drainage system.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Surfside NPDES Permit PROFESSIONAL SERVICES I CONSTRUCTION (if applicahle)
<br /> Surfside, Florida 2008-0ngoing
<br />d. (3) BRIEF DESCRIPTION (Briefscape, size, cost, etc.) AND SPECIFIC ROLE I8J Check if project performed with current firm
<br />CGA recently updated the Town's stormwater management program including an NPDES Guidance and Reference
<br /> Manual with inspection schedules, inspection forms and required documentation and procedures. Mr. Messerian is
<br /> coordinating the items set forth in the stormwater management program such as inspections of the stormwater
<br /> controls and documentation of the conditions with the Town Staff.
<br />
|