Laserfiche WebLink
<br />E. RESlJMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com tete one Section E or each ke <br /> <br /> <br />12. NAME <br />GIANNO FEOLI, ASLA, <br />AlA <br /> <br />13 ROLE IN THIS CONTRACT <br />Landscape Architecture <br /> <br />14 YEARS EXPERIENCE <br />b WITH CURRENT FIRM <br /> <br />a. TOTAL <br /> <br />8 <br /> <br />6 <br /> <br />15. FIRM NAME AND LOCATION (City and Stale) <br />Calvin, Giordano & Associates, Inc. - Fort Lauderdale, FL <br /> <br />16 EDUCATION (DH;REE AND SPF;CIAUZA lION) <br />Master of Landscape Architecture, Florida <br />International University, School of Architecture, <br />Miami, Florida <br />B.A., Architectural Studies, Florida International <br />Universit , School of Architecture, Miami, Florida <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (Sf A IE AN/J D1SCII'UNf) <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Pub/h:alions, OrxallizatiuflS, Train/ilK, Awardl, etc.) <br />Mr. Feoli leads the Landscape Department in creative design strategies and whose specialties include urban design, <br />contextual analysis and branding. His also leads all of CGA's master planning, community participation efforts and <br />graphic communication services. His experience has encompassed a wide array of project-types, but his strengths <br />lie in park design, streetscapes and urban interventions, and form-based urban design and planning. <br />19. RELEVANT PROJECTS <br /> <br />(1) TITLE AND LOCATION (CIty and Slare) <br />Doral Streetscape Beautification <br /> <br />Doral, Florida <br /> <br />(2) YEAR COMPLETED <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (ifapplicahle) <br />2006 <br /> <br />a. <br /> <br />(3) BRIEF DESCRIPTION (Bnefscope. SIze, COSI, elc.) AND SPECIFIC ROLE 181 Check ifproject performed with current firm <br />Designing entire length of Doral Boulevard (NW 36th StreetjNW 41st Street) from Palmetto Expressway to Florida's <br />Turnpike. Signature plantings will encompass a gateway design with special obranding" elements to distinguish the <br />new City. This will include special pavers and lush plantings while maintaining safe line-of-sight for the heavily used <br />roadwa that is closel ed ed with businesses, olf courses, resorts, and ated residential communities. <br /> <br />(1) TITLE AND LOCATION (Oly and Slale) <br />North Shore Neighborhood Improvements <br />Miami Beach, Florida <br /> <br />(2) YEAR COMPLETED <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (ifapplicahle) <br />2006 <br /> <br />b. <br /> <br />(3) BRIEF DESCRIPTION (Brrefswpe, .\l:e. CO.II. elc.) AND SPECIFIC ROLE 181 Check if project performed with current firm <br />Mr. Feoli was responsible for the implementation of all the BOOR's components, from design development through <br />construction documentation and into construction management. The agenda for the project was to ensure aesthetic <br />qualities in neighborhoods that presently have an ever-increasing demand for parking. To affect this, the installation <br />of planted bulb-outs, medians and planting strips within the Right-of-Way were implemented to beautify the <br />neighborhoods, provide shade for pedestrians, lessen the amount of storm water runoff demands of the existing <br />infrastructure and minimize the existin heat-island conditions.. <br />(1) TITLE AND LOCATION (CIty and Slale) (2) YEAR COMPLETED <br />Sunny Isles Town Center PROFESSIONAL SERVICES CONSTRUCTION (ifapplicahle) <br />Sunny Isles Beach, Florida 2004 <br />(3) BRIEF DESCRIPTION (Brrefscope, SIZe. cosl. elc.) AND SPECIFIC ROLE 181 Check if project performed with current firm <br />Mr. Feoli was responsible for creating a vision for the newly established Sunny Isles Town Center, through the <br />development of zoning ordinances specific to the 'district'. Mr. Feoli worked closely with civic and community leaders <br />to address the City's and the residents' concerns pertaining to overall densities, building heights, land uses, volumetric <br />character of the building masses, and open space requirements. Mr. Feoli, as a part of the visioning process, developed <br />a conceptual master plan that would alternatively drive the patterns of development in the town center. In addition, <br />great emphasis was given to the character of the sidewalk conditions and how they promote a pedestrian-friendly and <br />street-level culture that drives the vitality of a town center. Mr. Feoli presented the concepts and gained public input <br />and consensus throu h several communi worksho sand throu h commission hearin s. <br />(I) TITLE AND LOCATION (CIty and Slale) (2) YEAR COMPLETED <br />Community Enhancements PROFESSIONAL SERVICES CONSTRUCTION (ifapplicahle) <br />Ba Harbor Islands, Florida 2006 <br />(3) BRIEF DESCRIPTION (Briefscope, size. COSI, ele.) AND SPECIFIC ROLE 181 Check if project performed with current firm <br />Mr. Feoli worked closely with Town Staff to devise a strategy for improving the qualities and character of the Town's <br />west island's neighborhood, something the Town had been struggling with for over 5 years prior to contracting CGA. <br />The project consists of engineering and landscape improvements that will in essence upgrade the residential streets. <br />The proposal provides for designated walking areas, planted and irrigated bulb-outs and signage throughout. While <br />the scope of the project is similar to others in nature that CGA has performed, this project stands out as one where <br />CGA's heavy involvement in marketing, graphics and conflict resolution took center stage. These skills aided Mr. Feoli <br />is facilitating approval of the final design strategy, despite competing interests tearing it at its seams with varying <br />riorities: arkin versus safe versus beau all in less than ade uate s ace. <br /> <br />c. <br /> <br />d. <br />