Laserfiche WebLink
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Comolete one Section F for each oroiect) <br />21. TITLE AND LOCATION (City and State) <br />NORTH SHORE NEIGHBORHOOD IMPROVEMENTS <br /> <br />Miami Beach, Florida <br /> <br />20. EXAMPLE PROJECT <br />KEY NUMBER <br /> <br />6 <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION <br />Ongoing (If applicable) <br /> <br />a. PROJECT OWNER <br />City of Miami Beach <br /> <br />23. PROIECT OWNER'S INFORMATION <br />b. POINT OF CONTACT NAME <br />Miguel Perez <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(305) 673-7071 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />The project is located in the City of Miami Beach, in Miami-Dade County and consists of approximately 22,000 <br />linear feet of roadway, swales, and sidewalks extending North Shore Neighborhood of Miami Beach. CGA was <br />responsible for the implementation of all the BODR's components, from design development through construction <br />documentation and into construction management. This involved the installation of medians and planting strips <br />within the Right-of-Way, reconstruction of curb & gutter, reconstruction of swales, drainage structures and storm <br />sewer, and sidewalks. <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br /> Calvin, Giordano & Associates, Inc. Fort Lauderdale, Florida Civil & Electrical Engineering, <br />a. Landscape Architecture, and <br /> Survey <br />b. <br />c. <br />d. <br />