|
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br />
<br />12. NAME
<br />
<br />13. ROLE IN THIS CONTRACT
<br />
<br />14. YEARS EXPERIENCE
<br />
<br />ROBERTJ.BEHAR,PE
<br />
<br />PRINCIPAL IN CHARGE
<br />
<br />a. TOTAL
<br />33
<br />
<br />b. WITH CURRENT FIRM
<br />10
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />g R.J. BEHAR & COMPANY, INC.
<br />!a 6861 SW 196th Avenue, Suite 302
<br />Pembroke Pines, FL 33332
<br />
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />B.S. Civil Engineering, 1974
<br />M.E. Civil Engineering, 1975
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />1980/Professional Engineer #21755 Florida
<br />1997/ Professional Engineer #19836 Kentucky
<br />1997/Professional Engineer #6201043655 Michigan
<br />1997/Professional Engineer #E-62643 Ohio
<br />1997/Professional Engineer # 19800047 Indiana
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. Behar is the President of R.J. Behar & Company, Inc. He has over 33 years of experience in planning and design of engineering projects. He
<br />has also been involved in many municipal projects throughout Florida. He has extensive management experience, having managed over 65
<br />engineering projects. Mr. Behar's experience covers transportation, airports, general civil and structural design.
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> \-75/ Griffin Road Interchange - FOOT District 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Current
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm
<br /> Mr. Behar served as Principal in Charge for the traffic study to convert the existing rural interchange to a modified urban interchange. Services
<br /> include all the traffic modeling and the preparation of an Interchange Operation Analysis Report. The scope of services includes roadway
<br />a. improvements, drainage, permitting, bridge, structural, signing & pavement markings, signalization, lighting, landscaping and traffic analyses.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> SR 932/49th Street (NW 103rd Street from W. 2nd Avenue to E. 10th PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Avenue) - FOOT, District 6 2006
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm
<br /> QAlOfficer in Charge. Project consists of milling and resurfacing and ADA pedestrian ramp upgrades, length: 1.576 miles. RJ Behar produced all
<br />b. the roadway design plans, pavement marking & signing, lighting, drainage, utility coordination and permitting.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Atlantic Avenue (SR 806) Palm Beach County, Florida - FOOT District 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> 2007
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm
<br /> Principal-in-charge for the resurfacing (RRR) of a 3 mile section from Via Flora to Congress Avenue. The scope of this project consisted of
<br /> complete design of resurfacing 2.8 miles of a major arterial roadway including drainage improvements, pavement marking and signing, lighting
<br /> plans, eight signal locations, public involvement program and landscape improvements.
<br />c.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> SR A1A Resurfacing (RRR) - FOOT District 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> 2007
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, ete.) AND SPECIFIC ROLE [8J Check if project performed with current firm
<br /> Principal in Charge for the resurfacing plans for 5 miles of rural roadway from the Boynton Inlet to Lake Worth Road. The scope of services
<br /> included roadway design, drainage studies, drainage design, pavement marking and signing plans, signal plans, bridge plans, public involvement
<br /> and lighting plans, mitigation plans and permitting.
<br />d.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> NW 7th/9th Avenue Connector (Design) - City of Fort Lauderdale, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> 2008
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm
<br /> Principal in Charge - The project includes the roadway design of a 1.5 mile urban section, 4-lane divided, connector between NW 7th and NW 9th
<br /> Avenues in Downtown Fort Lauderdale. The scope of this project includes signalization, drainage design, signing pavement marking and
<br />e. permitting as well as public involvement coordination.
<br />
<br />STANDARD FORM 330 (1/2004) PAGE 1
<br />
|