My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
R.J. Behar & Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2010 2:22:25 PM
Creation date
11/17/2010 2:21:50 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 120. EXAMPLE PROJECT KEY <br />QUALIFICATIONS FOR THIS CONTRACT NUMBER <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. 04 <br />Complete one Section F for each project.) <br /> <br />21. TITLE AND LOCATION (City and State) <br />KEYSTONE POINT NEIGHBORHOOD - TRAFFIC STUDY <br /> <br />CITY OF NORTH MIAMI, FLORIDA <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2007 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER <br />City of North Miami, Community Planning <br />and Development Department <br />776 N E 125th Street <br />P.O. Box 610850 <br />North Miami, Florida 33161-0850 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size. and cost) <br /> <br />b. POINT OF CONTACT NAME <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br /> <br />Mr. John 0' Brien, <br />Transportation Planner <br /> <br />Tel: (305) 895-9830 Ext. 12159 <br /> <br />R. J. Behar & Company, Inc. was contracted by the City of North Miami to conduct a speed study for the Keystone Point Neighborhood. <br />This study was prompted by resident's complaints of speeding throughout the neighborhood. The study's objective was to determine the <br />number of vehicles traveling above the speed limit and overall traffic speeds throughout the neighborhood. Additionally, the report was to <br />include traffic calming measures that could be implemented to deter speeding. <br /> <br />1: U 4: <br />:H <br />: ~ '! <br /> <br />Nl:. .,:\en.l.."....... ~ <br />NE1~lt5J ~ <br />Nl13~l\l" ~ <br />N", 13~"ltrr..Cf" <br /> <br />~ ~ <br />~ N[1JettoS\ ~ <br />:; Nf.1)!ltt>ln 0 <br />N: 13!1m Tl"'TlKT <br /> <br />-~~";'~ <br /> <br />." <br /> <br />24-hour speed counts were taking at the following <br />seven locations, which had posted speed limits of 30 <br />mph: <br /> <br />N: ')~"s. <br /> <br />N( 135trSl <br /> <br />Alamanda Drive - East of Croton Road <br />. Alamanda Drive - West of Croton Road <br />Keystone Boulevard - East of Croton Road <br />. Keystone Boulevard - West of Croton Road <br />. Biscayne Bay Drive - West of Pine Road <br />Ixora Road - North of Hibiscus Drive <br />. North Bayshore Drive - North of Bayview <br />Lane <br /> <br />1 <br />l. <br />i <br /> <br />.:..r:t>Cr_D' <br />R "'" .. n <br />~ I { i <br />~ <br />o ~ <br /> <br />..,.",1;;.,_0< <br /> <br />u <br />~,s, ~fIr., l <br />Nt. I., <br /> <br />11(Ql~.Rll <br /> <br />. <br />. <br /> <br />~ I~Of:-Rc <br />~ <br />. <br /> <br />B<~~llf' B.<.y Dr _ <br />~ ! - <br />s XI ~ <br />1 <br /> <br />}~ <br /> <br />. <br />. " <br />.' <br />. . ~/~ <br />! le <br /> <br />~ <br />n <br /> <br />. <br />, <br /> <br />, <br />~ <br />, <br />. <br />. <br /> <br />s <br /> <br />-<> <br /> <br />I t <br />. s <br />j ~ & <br />IS J?' JA <br />o <br /> <br />." <br /> <br />&arv-L., <br /> <br />.~ <br /> <br /> <br />- Volume Counts <br />. Speed Counts <br /> <br />l\"'IIbI~~Dr <br /> <br />N'""tJI.'oU..D< <br /> <br />SHd;nal..Dr <br /> <br />s..'DIY......p' <br /> <br />s - <br /> <br />...~6'V<l <br /> <br />!..... <br />.""'.. <br />..""~ '" ... <br /> <br />#- 1.,s..........~()fltal: <br />..., ~ <br />.q! ~ <br />~'>;<9v 1 j <br />J <br /> <br />s. } <br />~ <br />o jf <br /> <br />..~-. <br /> <br />N~ ~'.lf; s: <br /> <br />L.",~l Lf' <br /> <br />NMlltlTIIB....c <br /> <br />em> <br /> <br />NE123rC1Sl @ ~ <br />I <br /> <br />:. <br /> <br />-, <br /> <br />':':' :: r <br />-.....- <br /> <br /> - - . - --- - <br /> (1 ) FIRM NAME (2) FIRM LOCATION (3) ROLE <br /> R.J. Behar & Company, Inc. 6861 SW 196th Avenue, Suite 302 Traffic study and traffic calming services. <br />a. Pembroke Pines, FL 33332 <br /> (1) FIRM NAME (2) FIRM LOCATION (3) ROLE <br />b. <br /> (1) FIRM NAME (2) FIRM LOCATION (3) ROLE <br />c. <br /> (1) FIRM NAME (2) FIRM LOCATION (3) ROLE <br />d. <br /> (1) FIRM NAME (2) FIRM LOCATION (3) ROLE <br />e. <br /> <br />FORM 330 (1/2004) PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.