|
<br />
<br />13. ROLE IN THIS CONTRACT
<br />Construction Inspector
<br />
<br />a. TOTAL
<br />13
<br />
<br />3
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />CES Consultants, Inc., Miami Lakes, FL (Headquarters)
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Construction Management, Construction Inspection Underground
<br />Utilities Inspection, Safety in the Construction Field, Extensive
<br />Document Control in The Quality Assurance and Quality Control
<br />aspect of Construction Projects.
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Ms. Ford has 13 years of experience in the field of construction and construction inspections. She has participated in the
<br />construction and construction management of underground utilities including water main installation, sanitary sewer
<br />force main installation, sanitary sewer gravity main installation, sanitary sewer lift station construction, storm sewer
<br />installation, and storm sewer pump station construction. Ms. Ford is also well equipped in producing accurate
<br />documentation in the aspect of Quality Control and Quality Assurance Construction Documentation.
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Waterworks 2011, City of Ft. Lauderdale, Ft. Lauderdale, FL PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable)
<br /> Ongoing
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X] Check if project performed with current firm
<br />a. Ms. Ford worked as a Resident Project Representative on various projects for the Fort Lauderdale Waterworks 2011 project..
<br /> Ms. Ford conducted daily inspections of the ongoing construction and prepared daily reports indicating all progress made
<br /> during the construction activities, and she conducted weekly progress meetings. Ms. Ford also verified all payment requisitions
<br /> prepared and submitted by the contractors, coordinated all required site testing, participated in community relations, and
<br /> prepared and verified all documentation reauired to properly close-out the individual proiects.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Various Debris Management Contracts, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Varies
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X] Check if project performed with current firm
<br />b. Ms. Ford provided debris monitoring services on various debris management contracts throughout the state of Florida. Her
<br />responsibilities included field verification of asset conditions, defining property lines on the field, monitored debris collection operations,
<br /> verified truck hauling activities, approved material delivery tickets, prepared daily reports, and prepared all documentation required to
<br /> properly close-out the individual projects. In addition, Ms. Ford participated in community outreach by working closely with property
<br /> owners to explain procedures and activities and assuring the publiC of all safety precautions.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Various Roadway & Underground Utilities Construction Projects, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> FL Varies
<br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X] Check if project performed with current firm
<br />Ms. Ford, as an equipment operator, placed material for road, bridges and approaches as per plan. Ms. Ford also inspected
<br /> the placement of water, sewer, electrical, and cable locations per plans. She also reviewed in place density and moisture
<br /> content readings to determine passes and compact modes. Additionally, Ms. Ford worked closely with DOT inspectors,
<br /> enqineers, surveyors, utility, traffic liahts and asphalt crews to successfully coml lete the construction activities.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Marlins Ballpark Stadium, Miami, FL PROFESSIONAL SERVICES -, CONSTRUCTION (If applicable)
<br /> 2012
<br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm
<br />Ms. Ford performs on-site field observations to oversee construction operations related to underground utilities of the public
<br /> infrastructure, verify contractor's compliance with the contract documents and applicable standards and regulations, review of
<br /> change order requests, review construction documents and As-Built drawings.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Kendall Soccer Park, Miami-Dade County, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> 2009
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X) Check if project performed with current firm
<br /> Ms. Ford worked as field inspector on the Kendall Soccer Park project. The major construction components of this project are
<br />e. the installation of four new artificial turf soccer fields, construction of a new restroom facility, the construction of a new parking
<br /> lot, construction of a water main extension, new irrigation system interconnected to the existing system and the resurfacing of
<br /> the existing parking lot. Ms. Ford conducted daily inspections of the construction activities and created daily reports that were
<br /> provided to the client. Ms. Ford verified compliance with the contract plans and specifications and also managed the RFI log,
<br /> the change order log, and the shop drawing log. She also conducted weekly progress meetings with the owner and the
<br /> contractor.
<br />
<br />STANDARD FORM 330 (fV2004) PAGE 1
<br />
|