Laserfiche WebLink
<br /> <br />20. EXAMPLE PROJECT <br />KEY NUMBER <br /> <br />3 <br /> <br />21 TITLE AND LOCATION (City and State) <br />Fort Lauderdale Water Works 2011Water, Sewer. Stormwater <br />and Force Main, Fort Lauderdale FL <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> <br />Ongoing <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER <br />City of Fort Lauderdale <br /> <br />b. POINT OF CONTACT NAME <br />Eva Gibson I CMTS Florida, LLC <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(954) 561-9197 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEV ANCE TO TIllS CONTRACT Ilnelllde scope. si=e. ond cost} <br /> <br />The City of Fort Lauderdale, in an effort to provide their residents with the most up to date water, sewer and <br />drainage services, has developed a long term capital improvements project to improve the city's infrastructure. <br />Under this project, the City is investing in excess of $550 million towards these improvements, the majority of <br />which are to be completed by 2011, <br /> <br />CES has been contracted to provide construction administration and oversight for the installation of various <br />infrastructure improvements. CES staff are placed on a full time basis to observe several work crews in various <br />stages of completion. We then produce daily reports that the client can use towards payment requisition <br />verification, schedule compliance, work site safety, and verification of construction adhering to the design <br />specifications. <br /> <br />Since our reports are developed and submitted to the client daily, the client is able to maintain the project <br />schedule and make corrections as needed. <br /> <br />Below is a list of some of the construction activities observed by our staff: <br /> <br />./ Water Main Installation <br />./ Sanitary Sewer Force Main Installation <br />./ Sanitary Sewer Gravity Sewer Installation <br />./ Pump Station Upgrade and Installation <br />./ Drainage Installation <br />./ Site Grading <br />./ Swale Reconstruction <br />./ Roadway Reconstruction <br />./ Sidewalk Reconstruction <br />./ Driveway Reconstruction <br /> <br /> <br />BEFORE <br /> <br />. <br />r <br /> <br />...-- <br />I <br /> <br />--... <br />l <br /> <br />The CES family always places the client's <br />concerns and needs first. To ensure client <br />satisfaction, we work closely with the client. We <br />discuss the progress throughout every phase of <br />the project thus ensuring that the client's <br />expectations are met. <br /> <br />~ <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />a. <br /> <br />(1) FIRM NAME <br />CES Consultants, Inc. <br /> <br />(2) FIRM LOCATION (City and State) <br />Miami Lakes, FL <br /> <br />(3) ROLE <br />Construction Oversight <br /> <br />(3) ROLE <br /> <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />c. <br /> <br />f. <br /> <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />STANDARD FORM 330 (&f2004) PAGE 5 <br />