My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fraga Engineers
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
Fraga Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2010 3:42:00 PM
Creation date
11/17/2010 3:41:50 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br /> QUALIFICATIONS FOR THIS CONTRACT NUMBER <br /> {Present as many projects as requested by the afcency, or TO pro;ects, if not specified. <br /> Complete one Section F or each project. 7 <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />State School YYY-1 (A new High Schoo 1 ) PROFESSIONAL SERVICES CONSTRUCTION (If app)icable) <br />Miami, FL 2007 2009 <br /> 23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER lb. POINT OF CONTACT NAME Ie. POINT OF CONTACT TELEPHONE NUMBER <br />M-DCPS Rolando Pardo 305-995-4837 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Fraga Engineers provided complete MEP services on this project. The project is a new <br />178,000 gsf high school facility in Miami, Florida. The budget is $35 million, and the <br />project GMP bid was under budget. <br />This project is pursuing LEED for Schools Gold certification (the first public school in <br />Miami-Dade County to pursue LEED certification of any type) . <br />This project showcases Fraga Engineers as taking the initiative in a project pursuing LEED <br />certification. <br />This project also shows how Fraga Engineers can work in an occupied facility. The State <br />School YYY-1 facility immediately abuts an occupied school (Macarthur HS) in Kendall Indian <br />Hammocks Park. State School YYY-1 was a phased project due to requirements that the <br />Macarthur students keep use of two buildings that will eventually be taken over and <br />remodeled as part of the YYY-1 projecL. Balancing the existing users of the Macarthur <br />facility, Parks users, and construction requirements of YYY-l are all qualities that are <br />required for the firm chosen for this project. <br />The complete gutting interior remodeling of an existing Science building on the campus and <br />subsequent conversion to new PE Lockers for YYY-l (keeping in mind LEED requirements) is <br />also excellent experience as it relates to the various projects to be completed <br />in a typical continuing services contract. <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. Fraga Engineers, LLC Coral Gables, FL MEP Engineer of Record <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />c. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br /> (1) FIRM NAME (2) FIRM LOCATION ICity and State) (3) ROLE <br />e. <br /> (1) FIRM NAME (2) FIRM LOCATION ICity and State) (3) ROLE <br />f. <br /> STANDARD FORM 330 (6/2004) PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.