My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fraga Engineers
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
Fraga Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2010 3:42:00 PM
Creation date
11/17/2010 3:41:50 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each proiect.) <br />21. TITLE AND LOCATION (City and State) <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />9 <br /> <br />Miami Killian SHS Repairs & <br />Rehabilication (Miami, FL) <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> <br />2006 <br /> <br />2008 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER <br /> <br />b. POINT OF CONTACT NAME <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br /> <br />M-DCPS Eduardo Lopez 305-995-4853 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size, and cost! <br />Fraga Engineers provided complete MEP services for this project. This compljcated, <br />technical project involved general maintenance for the entire school (including complete <br />re-design and replacement of chillers, air handlers, and ductwork), a new fire protection <br />system installation, interior remodeling of various areas and Auditorium, and complete <br />re-roofing. <br />The project budget was $15 million, and the project GMP was under the budget. <br />This extremely sensitive and complicated project involved the phasing and scheduling of <br />major remodeling and renovation work in every portion of the school while the school was <br />occupied and functioning. <br />The firm selected for the work at the continuing services contract must have intimate <br />knowledge of how to work successfully in a built-out building and/or campus setting, and <br />the Killian project is a prime example of how Lo achieve this. <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. Fraga Engineers, LLC Coral Gables, FL MEP Engineer of Record <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />C. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.