Laserfiche WebLink
<br />12, NAME <br />Mohammed A. Hai, P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com Jete one Section E for each ke erson. <br />13, ROLE IN THIS CONTRACT <br />Senior Geotechnical Engineer a TOTAL <br /> <br />17 <br /> <br />14, YEARS EXPERIENCE <br />b, WITH CURRENT FIRM <br />< 1 Year <br /> <br />15, FIRM NAME AND LOCATION (City and State) <br />Venco Engineering Company / Fort Lauderdale, FL. 33309 <br />16, EDUCATION (DEGREE AND SPECIALllA TlON) <br />MasterofScience in Civil Engineering (Geotechnical) <br />Florida Institute of Techno logy, Melbourne, Florida / 1998 <br />MasterofScience in Environmental Engineering. <br />Florida Institute of Technology, Melbourne, Florida / 1997 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />State of Florida - Professional Engineer No. 59345 <br />State of Georgia - Professional Engineer No. 030156 <br />State of Louisiana - Professional Engineer No. 33505 <br /> <br />1a, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Specialized Courses: Foundation design, Highway design, Geotechnical Engineering, Ground water transport, Numerical ground water <br />modeling, Design Concept of Urban Hydrology, Construction cost Estimating, Solid and Hazardous Waste Design, Solid Waste <br />Management, Hazardous Waste Management, Hazardous Waste Systems Design, Waste Water Biology, Aquatic Chemistry, <br /> <br /> (1) TITLE AND LOCATION (Clly and State) (2) YEAR COMPlETED <br /> Compound Extension Works At EU Police Headquarters- PROFESSIONAL SERVICES I CONSTRUCTION (It applicable) <br /> Accommodation Buildings A, B & C Kabul, Afghanistan 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE lxJ Check if project performed I/oIith current firm <br />a. <br /> Geotechnical subsurface soil exploration, which includes SPT borings and Auger borings, laboratory testing, geotechnical report <br /> preparation - geotechnical evaluation, site preparation including proof rolling, cut and fill placement, shallow foundation design, <br /> pavement design, drainage and other recommendations pertinent to geotechnical investigation. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPlETED <br /> Kabul Power Plant PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Kabul, Afghanistan 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope, SIZe, cost, etc.) AND SPECIFIC ROLE LxJ Check if project performed 'v'v'ith current firm <br />b. <br /> Geotechnical subsurface soil exploration, laboratory testing, geotechnical report preparation - geotechnical evaluation, site <br /> preparation, shallow foundation design, pavement design, drainage, soil resistivity, soil engineering parameters, and other <br /> recommendations pertinent to geotechnical issues. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPlETED <br /> Runway at Lashkar Gah Bost Airport (BST) PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Lashkar Gah, Afghanistan 2009 <br /> (3) BRIEF DESCRIPTION (Brlefscope, size. cost, etc) AND SPECIFIC ROLE lxJ Check if project performed with current firm <br />c. <br /> Geotechnical subsurface soil exploration, which includes SPT borings and Auger borings, laboratory testing, geotechnical report <br /> preparation - geotechnical evaluation and recommendations for base course and other issues pertinent to geotechnical investigation. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPlETED <br /> Warehouse buildings - Gravel road and container stockpiled PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Kabul, Afghanistan 2009 <br /> (3) BRIEF DESCRIPTION (Briefscope, size, cost. etc) AND SPECIFIC ROLE LxJ Check if project performed '.'lith current firm <br />d. <br /> Geotechnical subsurface soil exploration, laboratory testing, geotechnical report preparation - geotechnical evaluation, site <br /> preparation, shallow foundation design, drainage and other recommendations pertinent to geotechnical investigation. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPlETED <br /> Dormitory Building, Shaberghan PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Kabul, Afghanistan <br /> (3) BRIEF DESCRIPTION (Brief scope, SIZe, cost, etc) AND SPECIFIC ROLE lKJ Check if project performed 'With current firm <br />e. <br /> Geotechnical subsurface soil exploration, laboratory testing, geoteehnical report preparation - geotechnical evaluation, site <br /> preparation, shallow foundation design, drainage and other recommendations pertinent to geotechnical investigation. <br /> <br />19. RELEVANT PROJECTS <br /> <br />STANDARD FORM 330 (612004) PAGE 2 <br /> <br />Venco-Imtiaz Construction Company #2 <br />