|
<br />12, NAME
<br />Mohammed A. Hai, P.E.
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />Com Jete one Section E for each ke erson.
<br />13, ROLE IN THIS CONTRACT
<br />Senior Geotechnical Engineer a TOTAL
<br />
<br />17
<br />
<br />14, YEARS EXPERIENCE
<br />b, WITH CURRENT FIRM
<br />< 1 Year
<br />
<br />15, FIRM NAME AND LOCATION (City and State)
<br />Venco Engineering Company / Fort Lauderdale, FL. 33309
<br />16, EDUCATION (DEGREE AND SPECIALllA TlON)
<br />MasterofScience in Civil Engineering (Geotechnical)
<br />Florida Institute of Techno logy, Melbourne, Florida / 1998
<br />MasterofScience in Environmental Engineering.
<br />Florida Institute of Technology, Melbourne, Florida / 1997
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />State of Florida - Professional Engineer No. 59345
<br />State of Georgia - Professional Engineer No. 030156
<br />State of Louisiana - Professional Engineer No. 33505
<br />
<br />1a, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Specialized Courses: Foundation design, Highway design, Geotechnical Engineering, Ground water transport, Numerical ground water
<br />modeling, Design Concept of Urban Hydrology, Construction cost Estimating, Solid and Hazardous Waste Design, Solid Waste
<br />Management, Hazardous Waste Management, Hazardous Waste Systems Design, Waste Water Biology, Aquatic Chemistry,
<br />
<br /> (1) TITLE AND LOCATION (Clly and State) (2) YEAR COMPlETED
<br /> Compound Extension Works At EU Police Headquarters- PROFESSIONAL SERVICES I CONSTRUCTION (It applicable)
<br /> Accommodation Buildings A, B & C Kabul, Afghanistan 2008
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE lxJ Check if project performed I/oIith current firm
<br />a.
<br /> Geotechnical subsurface soil exploration, which includes SPT borings and Auger borings, laboratory testing, geotechnical report
<br /> preparation - geotechnical evaluation, site preparation including proof rolling, cut and fill placement, shallow foundation design,
<br /> pavement design, drainage and other recommendations pertinent to geotechnical investigation.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPlETED
<br /> Kabul Power Plant PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Kabul, Afghanistan 2008
<br /> (3) BRIEF DESCRIPTION (Brief scope, SIZe, cost, etc.) AND SPECIFIC ROLE LxJ Check if project performed 'v'v'ith current firm
<br />b.
<br /> Geotechnical subsurface soil exploration, laboratory testing, geotechnical report preparation - geotechnical evaluation, site
<br /> preparation, shallow foundation design, pavement design, drainage, soil resistivity, soil engineering parameters, and other
<br /> recommendations pertinent to geotechnical issues.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPlETED
<br /> Runway at Lashkar Gah Bost Airport (BST) PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Lashkar Gah, Afghanistan 2009
<br /> (3) BRIEF DESCRIPTION (Brlefscope, size. cost, etc) AND SPECIFIC ROLE lxJ Check if project performed with current firm
<br />c.
<br /> Geotechnical subsurface soil exploration, which includes SPT borings and Auger borings, laboratory testing, geotechnical report
<br /> preparation - geotechnical evaluation and recommendations for base course and other issues pertinent to geotechnical investigation.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPlETED
<br /> Warehouse buildings - Gravel road and container stockpiled PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Kabul, Afghanistan 2009
<br /> (3) BRIEF DESCRIPTION (Briefscope, size, cost. etc) AND SPECIFIC ROLE LxJ Check if project performed '.'lith current firm
<br />d.
<br /> Geotechnical subsurface soil exploration, laboratory testing, geotechnical report preparation - geotechnical evaluation, site
<br /> preparation, shallow foundation design, drainage and other recommendations pertinent to geotechnical investigation.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPlETED
<br /> Dormitory Building, Shaberghan PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Kabul, Afghanistan
<br /> (3) BRIEF DESCRIPTION (Brief scope, SIZe, cost, etc) AND SPECIFIC ROLE lKJ Check if project performed 'With current firm
<br />e.
<br /> Geotechnical subsurface soil exploration, laboratory testing, geoteehnical report preparation - geotechnical evaluation, site
<br /> preparation, shallow foundation design, drainage and other recommendations pertinent to geotechnical investigation.
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />STANDARD FORM 330 (612004) PAGE 2
<br />
<br />Venco-Imtiaz Construction Company #2
<br />
|