|
<br />12, NAME
<br />Dyna Munoz
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />Com fete one Section E for each ke erson.
<br />13, ROLE IN THIS CONTRACT
<br />Senior CADD Drafter a, TOTAL
<br />
<br />6
<br />
<br />14, YEARS EXPERIENCE
<br />b, WITH CURRENT FIRM
<br />
<br />< I Year
<br />
<br />15, FIRM NAME AND LOCATION (City and State)
<br />
<br />Venco Engineering Company / Fort Lauderdale, FL. 33309
<br />
<br />16, EDUCATION (DEGREE AND SPEC/AUlA nON)
<br />
<br />A.S. Computer Aided Drafting and Design
<br />Keiser University, Ft. Lauderdale, FL (2003)
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISC/PUNE)
<br />
<br />la, OTHER PROFESSIONAL QUALIFICATIONS (Pub/icallons, Organizations, Training, Awards. etc)
<br />
<br /> (1) TITLE AND LOCATION (CIty and State) (2) YEAR COMPLETED
<br /> National Load Control Center (NLCC) Building PROFESSIONAL SERVICES I CONSTRUCTION (lfapplicab/e)
<br /> Kabul, Afghanistan 2009
<br /> (3) BRIEF DESCRIPTION (Brietscope. size, cost, etc) AND SPECIFIC ROLE LxJ Check If project performed with current firm
<br />a.
<br /> Responsible for creating complete construction CADD drawing sets including, but not limited to underground plan, foundation plan,
<br /> floor plan, elevations, sections and details. Building to be constructed with reinforced CMU with steel and flat deck roofing.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPlETED
<br /> New Compound Construction and Rehabilitation Work on Existing Compound PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> European Union Police Mission in Afghanistan / Kabul, Afghanistan 2009
<br /> (3) BRIEF DESCRIPTION (Brie/ scope, size, cost, etc.) AND SPECIFIC ROLE LxJ Check if project performed with current firm
<br />b.
<br /> Responsible for creating complete Construction CADD drawing sets for 3 new 2 story buildings-staff accommodations (100 staff),
<br /> DF AC one story building-120 persons, new water well with pump house & chlorination system, septic waste storage & connections,
<br /> fresh water infrastructure, connection of electrical systems to existing power plant, concrete duct bank, concrete parking for 40
<br /> armored vehicles, 4 guard towers, security perimeter wall with hesco barriers, concertina wire, and sniper screen.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> EUPOL - Kabul: Sports Building PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Kabul, Afghanistan 2009
<br /> (3) BRIEF DESCRIPTION (BrIe/scope, size. cost, etc.) AND SPECIFIC ROLE LxJ Check if project performed VoIith current firm
<br />c.
<br /> Responsible for creating complete construction CADD drawing sets including but not limited to foundation plan, floor plans, roof
<br /> plan, elevations, sections and details for a 2 story building constructed with light gauge roof trusses bearing on traditional reinforced
<br /> concrete for the European Union Police Department (EUPOL).
<br /> (1) TITLE AND LOCATION (CI/yand State) (2) YEAR COMPLETED
<br /> Briella Townhomes PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Boynton Beach, Florida. USA. 2008
<br /> (3) BRIEF DESCRIPTION (BrIe/scope, size, cost, etc.) AND SPECIFIC ROLE U Check if project performed w'ith current firm
<br />d.
<br /> Responsible for creating complete Construction CADD drawing sets for 149 two-story townhomes (100m2 each), 6 building types,
<br /> pre-engineered wood floor & roof trusses, cmu masonry & shallow spread footing foundations. Structural plans to be incorporated
<br /> into the client's project documents.
<br /> (1) TITLE AND LOCATION (CIty and State) (2) YEAR COMPLETED
<br /> Independence Community PROFESSIONAL SERVICES I CONSTRUCTION (If applIcable)
<br /> Orlando, Florida 2006
<br /> (3) BRIEF DESCRIPTION (Brie/scope, size, cost, etc.) AND SPECIFIC ROLE U Check if project performed with current firm
<br />e.
<br /> Responsible for creating complete Construction CADD drawing sets for two-story town homes, (approx. 100m2 each), compounded
<br /> in five building types, constructed with pre-engineered wood floor and roof trusses, bearing on engineered unit masonry and
<br /> supported on shallow spread footing type foundations. Preparation of structural plans to be incorporated into the client's project
<br /> documents.
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />STANDARD FORM 330 (612004) PAGE 2
<br />
<br />Venco-Imtiaz Construction Company #2
<br />
|