Laserfiche WebLink
<br />\\V <br /> <br />PROJECT HISTORY <br /> <br />, ' <br /> <br /> <br />..~__~~--: r~ <br /> <br />_______1 <br /> <br />Patrick Air Force Base (AFB) <br />Civil Engineering Design <br /> <br /> <br />Project Description: <br /> <br />Mr. Agustin Perez was the Project Engineer responsible for the design and plans production. He was <br />the Senior engineer responsible for the storm water management system, drainage system, sanitary <br />gravity system, water main with fire hydrants, sanitary lift station evaluation and paving with grading <br />design. <br /> <br />This project consists of one story building having two retention pond areas with a positive discharge to <br />an Outstanding Florida Water. As a part of the design the existing lift station was relocated and the <br />existing pumps were evaluated and replaced, The existing 4-inch force main was relocated, An 8 inch <br />water main with approximately 600 L.F. was provided. Also 2 fire hydrants were included to meet the <br />fire requirements. <br /> <br /> <br />State Road 82 <br />Civil Engineering Design <br /> <br />,..., <br /> <br /> <br />Project Description: <br />Mr. Agustin Perez-Maldonado Assisted with the storm water collection system design. The <br />requirements for this project are based on the standards for the Florida Department of Transportation <br />and the South Florida Water Management District. <br /> <br />Tasks included assisting with the Pond Sitting Report, cross drain design, storm sewer design, spread <br />calculations, inlet capacity calculations and storm water management facility design. The typical <br />section for this project has changed, and the drainage plan is under redesign. Tailwater elevations for <br />the project were established from gage data for Six Mile Cypress Slough taken from DBHydro. <br />